Pre Project Stage Pharmaceuticals Projects Private Sector
Rs.307 Million New Pharmaceutical Mfg. Project in Kathua, Jammu and Kashmir
- Investment
- From 100 Million to 999 Million
- Stage
- Pre Project Stage
- Location
- Kathua, Jammu and Kashmir
- Last updated
- 28 Nov 2024
Project summary
A large-scale pharmaceutical manufacturing facility is set to be built in Kathua, Jammu and Kashmir, with a production capacity including 300 million tablets, capsules, and soft gel capsules, along with syrups, liquid and dry powder injections, and ampoules annually. The ₹307.9 million project aims to meet rising healthcare demands, with pre-project activities underway as of November 2024.
Project details
| Segment | Pharmaceuticals Projects |
|---|---|
| Industry | Chemicals |
| Products & capacity | Tablet General (300000000 Nos/Annum), Tablet Beta (300000000 Nos/Annum), Capsules General (300000000 Nos/Annum), Capsules Beta (300000000 Nos/Annum), Soft Gel Capsules (300000000 Nos/Annum), Dry Syrup (60000000 Bottles/Annum), Liquid Injections (15000000 Vials/Annum), Injections dry Powder (15000000 Vials/Annum), BFS (Respules-For Inhalation, Small Volume Parenteral, Large Volume Parenteral) (100000000 Ampules / Respules / Annum) |
| District | Kathua |
| State | Jammu and Kashmir |
| Investment | From 100 Million to 999 Million |
| Project type | New |
| Ownership | Private Sector |
| Stage | Pre Project Stage |
| Last updated | 28 Nov 2024 |
| Promoter / company | 🔒 Subscribers only Unlock |
| Site location & address | 🔒 Subscribers only Unlock |
| Promoter contact | 🔒 Subscribers only Unlock |
| Decision makers | 🔒 Subscribers only Unlock |
| Milestone history | 🔒 Subscribers only Unlock |
Get the full picture on this project
Unlock promoter details, exact site address, decision-maker contacts and milestone updates.