Project Work Commenced Steel Projects Private Sector
Pre-Engineering Building Material Mfg. Expansion Project in Tirupati, Andhra Pradesh
- Investment
- Less than 100 Million
- Stage
- Project Work Commenced
- Location
- Tirupati, Andhra Pradesh
- Last updated
- 14 Jul 2026
Project summary
An engineering firm is expanding its Pre-Engineered Building (PEB) material manufacturing plant in Tirupati, Andhra Pradesh. Located at Varadaiahpalem, the Rs. 91.9 million capacity expansion will increase structural component output from 20 TPD to 60 TPD. The project secured its vital state pollution control authority clearance as of July 2026, allowing machinery installation to commence.
Project details
| Segment | Steel Projects |
|---|---|
| Industry | Metallurgical Industries |
| Products & capacity | Pre-Engineering Building Material (from 20 TPD to 60 TPD) |
| District | Tirupati |
| State | Andhra Pradesh |
| Investment | Less than 100 Million |
| Project type | Expansion |
| Ownership | Private Sector |
| Stage | Project Work Commenced |
| Last updated | 14 Jul 2026 |
| Promoter / company | 🔒 Subscribers only Unlock |
| Site location & address | 🔒 Subscribers only Unlock |
| Promoter contact | 🔒 Subscribers only Unlock |
| Decision makers | 🔒 Subscribers only Unlock |
| Milestone history | 🔒 Subscribers only Unlock |
Get the full picture on this project
Unlock promoter details, exact site address, decision-maker contacts and milestone updates.