Projects in Telangana – Page 4

1,913 upcoming and ongoing projects in Telangana worth ₹848,653 Cr, with investment, location, project stage and latest status. Last updated 09 Oct 2026.

Projects tracked
1,913
Total investment
₹848,653 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
25

Latest projects in Telangana

Showing 16–20 of 1,913
  1. Environment Clearance Stage Other Chemicals Updated

    Rs.49625 Million Laundry and Liquid Detergent Manufacturing Expansion Project

    Telangana From 100 Million to 999 Million

    The State Pollution Control Board has granted Consent to Establish for expansion of an existing home care products manufacturing facility located at Penjerla village, Kothur Mandal, Rangareddy District, Telangana. The expansion primarily involves upgradation of water consumption, wastewater treatment, and hazardous waste handling systems to support existing production levels of 1000 TPD Laundry Detergents and 690 TPD Liquid Detergent. The project, valued at Rs. 49625.9 Million, is currently at the environmental clearance stage

    View project
  2. Pre Project Stage Electronics, Semiconductors & Data Centers Updated

    Rs.12500 Million hyper-scale data center project coming up at Chandanvelli, Rangareddy district, Telangana

    Telangana From 5000 Million to 49999 Million

    A hyper-scale data center is proposed to be developed on about 40.82 acres of TGIIC-allotted land at Chandanvelli village, Shabad Mandal, Rangareddy district, Telangana, with a Phase-1 built-up area of 1,28,894.76 sq mtr and 84 MW of IT load capacity. The complete site is designed for a total power requirement of 170 MVA. The proposal is a fresh Environmental Clearance application currently under verification with the Ministry of Environment, Forest and Climate Change.

    View project
  3. Environment Clearance Stage Non-Ferrous Metals Projects Updated

    Rs.640 Million Rare Earth Metal and Metal Coating Manufacturing Project in Pashamylaram, Sangareddy District, Telangana

    Telangana From 100 Million to 999 Million

    A new manufacturing facility is being set up to produce strip casting flakes, Neodymium Praseodymium metal, and nickel-copper-nickel, zinc coating and phosphating processes. The unit is located in IP-Pashamylaram, Phase-III, Sangareddy District with an investment of Rs. 640 Million. The State Pollution Control Board has granted Consent to Establish for the project, which is at the environmental clearance stage.

    View project
  4. Environment Clearance Stage Other Manufacturing Updated

    Rs.382 Million Diesel Generator Set Assembling Project in Rangareddy, Telangana.

    Telangana From 100 Million to 999 Million

    A new facility for assembling Diesel Generator sets with an integrated powder coating process is being established in Farooqnagar Mandal, Rangareddy District. The unit will have a capacity of 3600 DG sets per year with an investment of Rs. 382.4 Million. The State Pollution Control Board has granted Consent to Establish for the project, with Consent for Operation to be obtained prior to commencement of activity.

    View project
  5. Environment Clearance Stage Textiles / Yarn Updated

    Rs. 233 Million Cotton Spinning Mill Expansion Project in Mahaboobnagar district, Telangana

    Telangana From 100 Million to 999 Million

    A company expanding its cotton spinning mill at Pothlamadugu village in Mahaboobnagar district, Telangana, at a proposed cost of Rs. 233 Million (total project cost Rs. 637.4 Million). The expansion will raise cotton yarn capacity from 12,000 Kg/day to 20,800 Kg/day. The State Pollution Control Board has granted Consent to Establish for the expansion.

    View project