New & Upcoming Projects in Petroleum Projects in India

1,105 upcoming and ongoing petroleum projects in India worth ?31.33 lakh crore, with investment, location, project stage and latest status. Last updated 13 Oct 2026.

Projects tracked
1,105
Total investment
₹31.33 lakh crore
Projects above ₹100 Cr
519
Added in the last 30 days
9

Latest petroleum projects in India

Showing 1–5 of 1,105
  1. Pre Project Stage Petrochemicals Updated

    Rs.2000 Million Expansion of Expandable Polystyrene (EPS) Production Capacity Project in Tamil Nadu

    Tamil Nadu From 1000 Million to 4999 Million

    An existing petrochemical manufacturing facility is being expanded to scale up Expandable Polystyrene (EPS) production from 33,000 MTPA to 1,00,000 MTPA. Two new product lines — Specialty Polymer Compounds (50,000 MTPA) and Extruded Polystyrene (10,000 MTPA) — are being added, taking total capacity to 1,60,000 MTPA. The project is a brownfield expansion within the existing plant premises, currently under examination by the Ministry of Environment, Forest and Climate Change for fresh Terms of Reference.

    View project
  2. Environment Clearance Stage Oil & Gas and Refinery Updated

    Rs.528.1 Million Natural Gas Pipeline Project in Jagatsinghpur district, Odisha

    Odisha From 100 Million to 999 Million

    A 12-inch diameter natural gas pipeline spanning 6.775 Km is proposed to convey Natural Gas/RLNG from a tap-off location on the Paradeep Spur line to a Receiving Terminal inside a steel plant at Paradeep. The State Pollution Control Board has granted Consent to Establish for the project. The project is at the environmental clearance stage, with construction expected to commence within the validity period of the consent.

    View project
  3. Environment Clearance Stage Oil & Gas and Refinery Updated

    Rs.2580 Million Greenfield Tank Farm Project in Jagatsingpur, Odisha.

    Odisha From 1000 Million to 4999 Million

    A greenfield tank farm spread over 51 acres along with a 12.053 km pipeline (24" for HSD and 18" for MS) is being set up from North Oil Jetty of Paradip Port Trust to the POL terminal of Paradip Tanking Private Ltd. The facility will have storage tanks for MS, Ethanol and HSD along with a truck loading gantry. The project has received Consent to Establish from the State Pollution Control Board.

    View project
  4. Environment Clearance Stage Petrochemicals Updated

    Rs.199.845 Million Calcined Petroleum Coke Plant in Begusarai, Bihar

    Bihar From 100 Million to 999 Million

    A new industrial unit is being established to produce Calcined Petroleum Coke (CPC) with a capacity of 24,820 MT/Day at the Barauni Industrial Area in Begusarai district, Bihar. The project involves an investment of Rs. 199.845 Million and includes pollution control devices such as bag filters, stack monitoring systems, and a 35-meter stack for flue gas emission control. The unit has received Consent to Establish and will require Consent to Operate prior to commissioning.

    View project
  5. Environment Clearance Stage Oil & Gas and Refinery Updated

    Rs.1034080 Million Refinery and Petrochemical Project in Nellore district, Andhra Pradesh

    Andhra Pradesh More than 49999 Million

    A 9 MTPA greenfield refinery and petrochemical complex is being set up on 5,200 acres near Ramayapatnam Port in Nellore district, Andhra Pradesh, with a product slate spanning transportation fuels and petrochemicals. The project has just received the Expert Appraisal Committee's recommendation for environmental and CRZ clearance, paving the way for construction to begin. The complex will also include dedicated zones for green hydrogen, renewables, and a marine crude oil terminal.

    View project