Other Manufacturing Projects in India – Page 82

1,907 upcoming and ongoing other manufacturing projects in India worth ₹263,059 Cr, with investment, location, project stage and latest status. Last updated 12 Oct 2026.

Projects tracked
1,907
Total investment
₹263,059 Cr
Projects above ₹100 Cr
373
Added in the last 30 days
23

Latest other manufacturing projects in India

Showing 406–410 of 1,907
  1. Project Work Commenced Other Manufacturing Updated

    New GI Perforated Cable Tray Mfg. Project in Khordha, Odisha

    Odisha NA

    A new GI perforated cable tray manufacturing project is planned in Gadakana, Mancheswar Industrial Estate, Bhubaneswar, Khordha, Odisha, with a production capacity of 12 MT per month. The project aims to support industrial and electrical infrastructure needs. As of April 2025, the company has received consent from the state pollution control authorities to establish the facility.

    View project
  2. Project Work Commenced Other Manufacturing Updated

    New Cable Tie, Cable Glad, Cable Clips Mfg. Project in Howrah, West Bengal

    West Bengal Less than 100 Million

    A new electrical components manufacturing project is set to launch in Bakshihat, PS Bagnan, Howrah, West Bengal. It includes the production of cable ties, cable glads, clips, indicator lights, industrial plugs and sockets, and float switches with a combined capacity of 149 MT/month. Estimated at Rs.49 million, the project received environmental clearance in April 2025.

    View project
  3. Project Work Commenced Other Manufacturing Updated

    New Bulk Explosive/Site Mixed Explosive Mfg. Project in Raigarh, Chhattisgarh

    Chhattisgarh NA

    A new manufacturing project for Bulk Explosive/Site Mixed Explosive with a capacity of 75,000 metric tonnes per year is planned in Dokurbuda, Gharghoda, Raigarh, Chhattisgarh. The facility aims to support industrial and mining activities. As of April 2025, the project has received consent from the state pollution control authorities for establishment and development.

    View project
  4. Project Work Commenced Other Manufacturing Updated

    Rs.445 Million Solar Panel Steel Structure Mfg. Project in Kamrup, Assam

    Assam From 100 Million to 999 Million

    A new manufacturing project is planned in Dagaon, Rangia, Assam, focusing on solar panel steel structures, GI steel electrical poles, crash barriers, GI castings, and tower structures. With a combined capacity of over 42,000 MTPA, the project is estimated to cost Rs.445 million. As of April 2025, it has received clearance from the state pollution control authorities.

    View project
  5. Project Work Commenced Other Manufacturing Updated

    New Conveyor Belt Mfg. Project in Durg, Chhattisgarh

    Chhattisgarh NA

    A new manufacturing project is planned in Bhilai, Durg, Chhattisgarh, involving the production of 20,000 meters of conveyor belts annually, along with pully blocks, roller rubber, synthetic rubber sheets, vulcanizing material, and iron/steel wire mesh. The project has received approval from the state pollution control authorities as of April 2025 and is set to enhance local industrial capabilities.

    View project