Other Manufacturing Projects in India – Page 2

1,906 upcoming and ongoing other manufacturing projects in India worth ₹255,059 Cr, with investment, location, project stage and latest status. Last updated 09 Oct 2026.

Projects tracked
1,906
Total investment
₹255,059 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
23

Latest other manufacturing projects in India

Showing 6–10 of 1,906
  1. Environment Clearance Stage Other Manufacturing Updated

    Metal Fabrication Manufacturing Project in Bhilai, Chhattisgarh

    Chhattisgarh NA

    A facility for assembly and erection of prefabricated structures along with fabricated metal products (excluding machinery and equipment) has been granted environmental consent at Hathkhoj Heavy Industrial Area, Bhilai. The unit has a combined annual capacity of 1,000 tonnes of prefabricated structures and 3,000 tonnes of fabricated metal products. No specific project cost or commissioning timeline is disclosed in the consent document.

    View project
  2. Pre Project Stage Other Manufacturing Updated

    Rs.21000 Million Integrated Advanced Fabrication & Manufacturing Complex in Ganjam, Odisha

    Odisha From 5000 Million to 49999 Million

    An integrated advanced fabrication and manufacturing complex focused on mechanical and electrical capital goods is being planned in Ganjam district, Odisha. The project is expected to generate significant employment, with potential employment of around 1,000 people. The project is currently at an early clearance stage, with no specific commissioning timeline disclosed.

    View project
  3. Environment Clearance Stage Other Manufacturing Updated

    Rubber Pads Manufacturing Project in Sangareddy, Telangana

    Telangana Less than 100 Million

    A new unit for manufacturing rubber pads used in rail fastening systems is being set up at Bollaram Village, Jinnaram Mandal, Sangareddy District. The unit will produce 40,000 Nos./Month of rubber pads using cutting and pressing machines, with a total project cost of Rs. 40 Million. The State Pollution Control Board has issued Consent for Establishment for the project.

    View project
  4. Environment Clearance Stage Other Manufacturing Updated

    Engineering Parts Manufacturing Project in Nagpur, Maharashtra

    Maharashtra Less than 100 Million

    A new engineering components manufacturing facility is being set up at Hingna Industrial Area in Nagpur district, Maharashtra, with a capital investment of Rs. 67.2 Million. The State Pollution Control Board has granted Consent to Establish under the Green Category for the unit, which will have a manufacturing capacity of 50 Ton/Month of engineering parts. The project is currently at the environmental clearance stage, with commissioning timelines yet to be disclosed.

    View project
  5. Pre Project Stage Other Manufacturing Updated

    Rs.2226 Million New Manufacturing Facility in Nellore, Andhra Pradesh

    Andhra Pradesh From 1000 Million to 4999 Million

    An enterprise is establishing a new manufacturing facility in Nellore, Andhra Pradesh, with an estimated investment of Rs. 2,226.8 million. As of September 2026, the project has secured formal investment approval from the State Investment Promotion Board, paving the way for upcoming development.

    View project