New & Upcoming Projects in Other Manufacturing Projects in India – Page 140

1,892 upcoming and ongoing other manufacturing projects in India worth ?245,432 Cr, with investment, location, project stage and latest status. Last updated 14 Oct 2026.

Projects tracked
1,892
Total investment
₹245,432 Cr
Projects above ₹100 Cr
361
Added in the last 30 days
27

Latest other manufacturing projects in India

Showing 696–700 of 1,892
  1. Project Work Commenced Other Manufacturing Updated

    Loading & Unloading Machinery Accessories Mfg. Expansion Project in Thane, Maharashtra.

    Maharashtra Less than 100 Million

    A manufacturing expansion project for accessories is planned in Asangaon Village, Thane, Maharashtra. It includes various capacities for machinery like loading & unloading equipment, meter skid packages, and steel fabrication, costing Rs.49.5 million. Consent from state pollution control authorities has been obtained as of April 2024.

    View project
  2. Project Work Commenced Other Manufacturing Updated

    Rs.167 Million New Bush, Bearings Mfg. Project in Kolhapur, Maharashtra

    Maharashtra From 100 Million to 999 Million

    A new bush and bearings manufacturing project is proposed in MIDC Gokul Shirgaon, Kolhapur, Maharashtra. The project aims to manufacture bush (150 MT/M), bearings (150 MT/M), and thrust washers (200 MT/M), costing Rs.167.3 million. Consent for project establishment has been granted by state pollution control authorities as of April 2024.

    View project
  3. Project Work Commenced Other Manufacturing Updated

    New Surgical Cotton Mfg. Project in Rewa, Madhya Pradesh

    Madhya Pradesh Less than 100 Million

    A new Surgical Cotton manufacturing project is planned in Rewa, Madhya Pradesh, with a capacity of 150 MT/Year. The estimated project cost is Rs.45.6 million. As of April 2024, the company has received consent from state pollution control authorities to proceed with establishing the project.

    View project
  4. Project Work Commenced Other Manufacturing Updated

    Rs.1475 Million New Installation Producer Gas Plant in Keonjhar, Odisha

    Odisha From 1000 Million to 4999 Million

    A new installation project for a producer gas plant is planned in Barbil, Odisha, with a capacity of 184650 Nm3/hr, replacing the existing plant of 245000 Nm3/hr. The project's estimated cost is Rs.1475.1 million. Consent from state pollution control authorities has been obtained as of April 2024.

    View project