Other Manufacturing Projects in Telangana – Page 12

163 upcoming and ongoing other manufacturing projects in Telangana worth ₹11,939 Cr, with investment, location, project stage and latest status. Last updated 02 Oct 2026.

Projects tracked
163
Total investment
₹11,939 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
3

Latest other manufacturing projects in Telangana

Showing 56–60 of 163
  1. Project Work Commenced Other Manufacturing Updated

    Electronic and Plastic Equipments Mfg. Expansion Project

    Telangana Less than 100 Million

    A company is expanding its manufacturing facility in EMC Maheshwaram, Telangana, to increase production of electronic, plastic, and metal equipment. The expansion will enable the daily production of various components, including TPW stand assemblies, body rings, and plastic gear boxes. Estimated at ₹90.3 million, the project has obtained environmental clearance from the Telangana State Pollution Control Board by November 2024.

    View project
  2. Project Work Commenced Other Manufacturing Updated

    Electric Components Mfg. Expansion Project in Sangareddy, Telangana

    Telangana From 1000 Million to 4999 Million

    A company is expanding its electrical components manufacturing facility in Rudraram, Telangana, to increase production capacity. The expansion will include the production of transformer tanks, radiators, cable boxes, amorphous metal transformers, and insulated wires/strips. Estimated at ₹2,546 million, the project has received consent from the Telangana State Pollution Control Board as of November 2024, ensuring environmental compliance.

    View project
  3. Project Work Commenced Other Manufacturing Updated

    Rs.1650 Million New Engineering Components Mfg. Unit in Medchal, Telangana

    Telangana From 1000 Million to 4999 Million

    A new engineering components manufacturing unit is being developed in Industrial Park Tunikibollaram, Siddipet, Telangana, with an investment of Rs. 1,650 million. The project includes producing steam and gas turbine blades at a capacity of 6,000 units per day. By October 2024, the company had invested an additional Rs. 47 million and received environmental approvals.

    View project
  4. Project Work Commenced Other Manufacturing Updated

    Rs.860 Million Steel Metal Fabrication Unit Expansion Project in Medchal-Malkajgiri, Telangana

    Telangana From 100 Million to 999 Million

    A new expansion project in Yellampet, Telangana, will establish a facility for manufacturing modular clean room components, including partitions, ceiling doors, and switch units. The project, with an estimated cost of Rs. 860.9 million, aims to boost production capabilities. As of August 2024, necessary environmental approvals have been obtained.

    View project
  5. Project Work Commenced Other Manufacturing Updated

    New PVC Roofing System manufacturing unit in Nalgonda, Telangana

    Telangana NA

    A new PVC roofing system manufacturing unit is being established in Nalgonda, Telangana, with a daily production capacity of 700 kg. The Rs. 35.2 million project has secured environmental approval as of August 2024 and will enhance the company's product offerings and market presence. Construction and operations are set to commence following regulatory compliance.

    View project