Rs.30000 Million New Integrated Steel Plant in Keonjhar, Odisha
Executive Summary: A new 1.2 MTPA integrated steel plant is planned in Keonjhar, Odisha, with an estimated cost of ₹30,000 million. The project aims to boost steel production and regional industrial growth. As of March 2025, investment approval has been received from the High-Level Clearance Authority, enabling progress toward the plant’s establishment.
-
Industry: Metallurgical Industries
State: Odisha
Investment Range: From 5000 Million to 49999 Million
28 March 2025

Rs.52000 Million New Integrated Steel Plant in Bhadrak, Odisha
Executive Summary: A new 1.5 MTPA-capacity integrated steel plant is planned in Bhadrak, Odisha, with both upstream and downstream facilities. The project is estimated to cost ₹52,000 million. As of March 2025, consent has been received from the state pollution control authorities to establish the plant, marking a key regulatory approval for the project.
-
Industry: Metallurgical Industries
State: Odisha
Investment Range: From 5000 Million to 49999 Million
28 March 2025

Rs.505370 Million New Alumina Refinery Plant in Rayagada, Odisha
Executive Summary: A new 6 MTPA Alumina Refinery Plant is planned in Rayagada, Odisha, with an estimated cost of ₹505,370 million. As of March 2025, the project has received investment approval from the High-Level Clearance Authority. The plant aims to boost alumina production, supporting the aluminum industry and fostering regional economic growth.
-
Industry: Metallurgical Industries
State: Odisha
Investment Range: More than 49999 Million
28 March 2025

Rs.1750 Million New Grain Based Ethanol Plant in Balangir, Odisha
Executive Summary: A new grain-based ethanol plant is planned in Kerbeda, Patnagarh, Balangir, Odisha, with a capacity of 120 KLPD and a 3.5 MW co-generation power plant. The project, estimated to cost Rs.1750 million, is set to begin construction in March 2025 and finish by October 2025. As of December 2024, it is awaiting environmental clearance from the State Level Environment Impact Assessment Authority.
-
Industry: Distillery
State: Odisha
Investment Range: From 1000 Million to 4999 Million
27 March 2025

Rs.120000 Million New Copper Smelter Mfg. Unit in Odisha
Executive Summary: A new copper smelter manufacturing unit is planned in Odisha with an initial capacity of 500,000 metric tons, later expanding to 1 million metric tons by 2033-34. The ₹120,000 million project will process copper concentrate from Peru and Chile. As of March 2025, pre-project activities, including site preparation and feasibility studies, are in progress.
-
Industry: Metallurgical Industries
State: Odisha
Investment Range: More than 49999 Million
26 March 2025

Rs.1524 Million New Plastic Products Mfg. Unit in Khordha, Odisha
Executive Summary: A new plastic products manufacturing unit is planned in Khordha, Odisha, involving the production of plastic caps, PET preforms, and allied products. The estimated cost of the project is Rs. 1524.8 million. Approval has been obtained from the State Level Single Window Clearance Authority as of July 2023.
-
Industry: Manufacturing
State: Odisha
Investment Range: From 1000 Million to 4999 Million
25 March 2025

Rs.1150 Million New Textile Unit in Cuttack, Odisha
Executive Summary: A new textile manufacturing unit is planned in Cuttack, Odisha, to produce 1,200 MT of fabric, 30 lakh T-shirts, and 22 lakh casual wear pants. The project, estimated at Rs. 1,150 million, aims to boost textile production and employment. As of March 2025, it has received approval from the State Level Single Window Clearance Authority (SLSWCA).
-
Industry: Textiles
State: Odisha
Investment Range: From 1000 Million to 4999 Million
24 March 2025

Rs.1080 Million New Ready-to-Drink Beverages Mfg. Unit in Khordha, Odisha
Executive Summary: A new manufacturing unit for ready-to-drink beverages, personal care products, condiments, and sauces is planned in Khordha, Odisha. The project, estimated at Rs. 1,080 million, aims to boost production capacity and economic growth. As of March 2025, it has received approval from the State Level Single Window Clearance Authority (SLSWCA), moving closer to implementation.
-
Industry: Food Processing
State: Odisha
Investment Range: From 1000 Million to 4999 Million
24 March 2025

Rs.5153 Million Food Processing Unit Expansion Project in Khordha, Odisha
Executive Summary: A leading beverage manufacturer is expanding its food processing unit in Khordha, Odisha, to boost production capacity. The ₹5,153.2 million project has received approval from the State Level Single Window Clearance Authority (SLSWCA) as of March 2025. This expansion aims to enhance efficiency and strengthen its presence in the food and beverage sector.
-
Industry: Food Processing
State: Odisha
Investment Range: From 5000 Million to 49999 Million
21 March 2025

Rs.553 Million New Preclinical Testing and Animal Breeding Facility in Khordha, Odisha
Executive Summary: A new preclinical testing and animal breeding facility is planned in Khordha, Odisha, with an investment of ₹553.6 million. The project aims to enhance research capabilities for pharmaceutical and scientific applications. As of March 2025, it has received approval from the State Level Single Window Clearance Authority (SLSWCA) and is set for further development.
-
Industry: Food Processing
State: Odisha
Investment Range: From 100 Million to 999 Million
21 March 2025