Showing 376–380 of 3,591
  1. Project Work Commenced Electronics, Semiconductors & Data Centers Updated

    Rs.685 Million Inverter Mfg. Expansion Project in Solan, Himachal Pradesh

    Himachal Pradesh From 100 Million to 999 Million

    An inverter manufacturing expansion project is underway in Malpur village, Baddi, Solan, Himachal Pradesh. The project includes increased production of inverters, UPS, stabilizers, water purifiers, transformers, PCBs, and solar products, with recent additions of lithium-ion battery assembly (16,000 Nos/Y) and testing (32,000 Nos/Y). The project involves an investment of Rs. 551.48 million and has received state pollution control consent as of January 2026.

    View project
  2. Under Implementation Other Manufacturing Updated

    Rs.7240 Million New Industrial Shed Construction Project in Pune, Maharashtra

    Maharashtra From 5000 Million to 49999 Million

    A new industrial shed construction project is proposed in Chakan Industrial Area Phase-II, Khalumbre village, Khed taluka, Pune, Maharashtra. The project involves developing an industrial shed with a built-up area of about 135,287 sq m. The investment is estimated at Rs. 7,240 million. Construction is planned from March 2026 to January 2028, with environmental clearance under review.

    View project
  3. Under Implementation Other Manufacturing Updated

    Rs.8323 Million New Refractory Mfg. Project in Khurda, Odisha

    Odisha From 5000 Million to 49999 Million

    A new refractory manufacturing project is proposed in Bhuinpur, Begunia, Khurda district, Odisha. The facility will produce a range of acidic and basic refractory bricks, monolithics, steel casting flux, and precast products on a 161,950 sq m site. The investment is estimated at Rs. 8,323 million, with construction planned from April 2026 to April 2029 and environmental clearance under review.

    View project
  4. Under Implementation Other Manufacturing Updated

    Rs.1400 Million Metal Inert Gas Wire Mfg. Expansion Project in Chengalpattu, Tamil Nadu

    Tamil Nadu From 1000 Million to 4999 Million

    A metal inert gas wire manufacturing expansion project is planned in an industrial park at Anjur, Chengalpattu, Tamil Nadu. The built-up area will increase from 16,302.55 sq.m to 23,290.58 sq.m, adding 10,000 TPA capacity, complementing existing production. The project is estimated at Rs. 1,400 million, with construction from March to September 2026, and has been submitted for environmental clearance.

    View project
  5. Project Work Commenced Other Manufacturing Updated

    Rs.600 Million New Tyre Pyrolysis and Recovered Carbon Black Mfg. Unit in Purba Medinipur, West Bengal.

    West Bengal From 100 Million to 999 Million

    A new tyre pyrolysis and recycled carbon black manufacturing unit is planned in Haldia, Purba Medinipur, West Bengal. The facility will recycle waste tyres to produce pyrolysis oil (15,600 TPA), recycled carbon black (12,200 TPA), and pyrolysis char (14,000 TPA). The project, with an investment of Rs. 6,000 million, includes advanced pollution control, zero liquid discharge systems, and automated safety features.

    View project