New & Upcoming Projects in Manufacturing Projects in India – Page 2

3,591 upcoming and ongoing manufacturing projects in India worth ?29.58 lakh crore, with investment, location, project stage and latest status. Last updated 15 Oct 2026.

Projects tracked
3,591
Total investment
₹29.58 lakh crore
Projects above ₹100 Cr
813
Added in the last 30 days
45

Latest manufacturing projects in India

Showing 6–10 of 3,591
  1. Project Work Commenced Other Manufacturing Updated

    Rs.2000 Million New LED TV Plastic Components Mfg. Project in Tirupati, Andhra Pradesh

    Andhra Pradesh From 100 Million to 999 Million

    A new project for manufacturing LED TV plastic components with a capacity of 84,000 Nos. per month is planned at a cost of Rs.136.5 million in Govindavaram Village, Tirupati, Andhra Pradesh. As of February 2023, the company has received the necessary approvals from state pollution control authorities to establish the project.

    View project
  2. Pre Project Stage Other Manufacturing Updated

    Rs. 3500 Million UCPL Industrial Manufacturing Unit in Vizianagaram, Andhra Pradesh

    Andhra Pradesh From 1000 Million to 4999 Million

    A new industrial shed spanning over 1.17 lakh sq m is proposed to house a manufacturing unit producing busway, cable tray, unistrut, structural and sprinkler assemblies. The proposal has been accepted and referred to the State Expert Appraisal Committee for environmental clearance. Construction is yet to commence, with the unit expected to generate significant employment during both build and operational phases.

    View project
  3. Environment Clearance Stage Packaging and Plastics Updated

    Ropp Caps Manufacturing Project in Vaishali district, Bihar

    Bihar NA

    A new manufacturing facility for Ropp Caps (Roll-On Pilfer Proof bottle closures) is planned at the Hajipur Industrial Area in Vaishali district. The unit will have a production capacity of 900 million pieces per year. The project has received Consent to Establish from the State Pollution Control Board and is at the environmental clearance stage ahead of commissioning.

    View project
  4. Environment Clearance Stage Packaging / Plastics Updated

    Rs.301 Million Diversified Building Materials & Fabrication Expansion Project in Nalgonda, Telangana

    Telangana From 100 Million to 999 Million

    A Telangana-based industrial manufacturer is expanding its existing facility in Nalgonda District with an additional investment of Rs. 300 Million. The expansion covers a wide product basket including plastic pipes, PEB and Mivan structures, roofing sheets, doors/windows, electrical wires and panels, construction chemicals, and aluminium billets. The project has received Consent to Establish (Expansion) from the State Pollution Control Board and is at the environmental clearance stage.

    View project
  5. Environment Clearance Stage Packaging and Plastics Updated

    Rs.1583 Million Flexible Polyurethane Foam Manufacturing Project in Chittoor District, Andhra Pradesh

    Andhra Pradesh From 1000 Million to 4999 Million

    A new manufacturing facility for Flexible Polyurethane Foam and its articles, with an installed capacity of 1200 TPA, is proposed on a 48.64-acre site at Gandrajuapalle Village, Gangavaram Mandal, Chittoor District. The project carries a total cost of Rs. 1583.9 Million. The State Pollution Control Board has granted Consent to Establish for the unit.

    View project