  1. Project Work Commenced Packaging / Plastics Updated

    Rs.107 Million Aluminium Blister Foils Mfg. Project in Sangareddy, Telanagana

    Telangana From 100 Million to 999 Million

    A new manufacturing project is planned in IDA Bollaram, Jinnaram, Sangareddy, Telangana, to produce aluminium blister foils (15 TPD), aluminium strip foils (10 TPD), laminated foils (20 TPD), and PET bottles (12 TPD). With an estimated cost of Rs. 107 million, the project has received establishment consent from the state pollution control authorities as of August 2025.

    View project
  2. Project Work Commenced Other Manufacturing Updated

    Rs.595 Million Metal Injection Moulding Parts Mfg Unit in Rangareddy, Telangana

    Telangana From 100 Million to 999 Million

    A new metal injection moulding parts manufacturing unit is planned in IP General Park, Maheshwaram, Rangareddy, Telangana. With a proposed capacity of 40 tons per month, the project is estimated to cost ₹595.7 million. As of August 2025, necessary environmental clearances have been granted by state pollution control authorities, allowing the project to proceed toward establishment.

    View project
  3. Project Work Commenced Packaging / Plastics Updated

    New Plastic Container Mfg. Project in Medchal-Malkajgiri, Telangana

    Telangana NA

    A new plastic container manufacturing project is planned in Pudoor, Medchal, Telangana, focusing on producing containers for medical and R&D applications. The facility will support healthcare and laboratory sectors with specialized packaging solutions. As of July 2025, the project has received consent to establish from the state pollution control authorities and is set to move forward.

    View project
  4. Project Work Commenced Other Manufacturing Updated

    Rs.288 Million New Steel Fabricated Steel Structure Mfg. Unit in Nalgonda, Telangana

    Telangana From 100 Million to 999 Million

    A new steel fabricated structure manufacturing unit is planned in Veliminedu, Chityala, Nalgonda, Telangana, with a proposed capacity of 500 tonnes per day (TPD). The project is estimated to cost ₹288.2 million. As of July 2025, necessary environmental clearances have been obtained from the state pollution control authorities, paving the way for its establishment and future operations.

    View project
  5. Project Work Commenced Paper Products Updated

    Rs.3078 Million Krall Paper Mfg. Project in Rangaredtly, Telangana

    Telangana From 100 Million to 999 Million

    A manufacturing expansion project is underway in Rangareddy, Telangana, aimed at increasing the production of white board, kraft board, and duplex board to a total capacity of 158,400 TPA. The project also includes a co-generation power unit generating 7 MW from biofuel and 3 MW from solar energy. With an estimated investment of ₹900 million, it received approval from state pollution control authorities in March 2024.