New & Upcoming Projects in Manufacturing Projects in Madhya Pradesh – Page 22

255 upcoming and ongoing manufacturing projects in Madhya Pradesh worth ?0.33 lakh crore, with investment, location, project stage and latest status. Last updated 01 Sep 2026.

Projects tracked
255
Total investment
₹0.33 lakh crore
Projects above ₹100 Cr
43
Added in the last 30 days
0

Latest manufacturing projects in Madhya Pradesh

Showing 106–110 of 255
  1. Project Work Commenced Other Manufacturing Updated

    Rs.224 Million New Heavy Fabrication Project in Bopal, Madhya Pradesh

    Madhya Pradesh From 100 Million to 999 Million

    A heavy fabrication project is planned in Madhya Pradesh, involving 9000 MT of production and an estimated cost of Rs. 224.5 million. The project has received consent from the state pollution control authorities as of August 2022.

    View project
  2. Project Work Commenced Other Manufacturing Updated

    New Cable Mfg. Project in Rajgarh, Madhya Pradesh

    Madhya Pradesh NA

    A cable manufacturing project is planned in Rajgarh, MP with a capacity of 120,000 KMS. The project will expand the manufacturing capacity of single core cable to 270,000 Km/Y, multi-core cable to 54,000 Km/Y, tinned copper to 1000 MT/Y, PVC specialty compound to 12,000 MT/Y, and include 2 electroplating tinning machines with an investment of Rs. 264.5 Million. The project has received consent from state pollution control authorities and is currently underway.

    View project
  3. Pre Project Stage Paper Products Updated

    New Paper Products Mfg. project in Dhar, Madhya Pradesh

    Madhya Pradesh NA

    A new paper products manufacturing project with a capacity of 4000 MT is planned to be set up in Dhar, Madhya Pradesh. The project is in the planning stage, with an industrial entrepreneurs' memorandum filed in April 2022, aimed at expanding product portfolio and meeting the growing demand for paper-based products.

    View project
  4. Project Work Commenced Other Manufacturing Updated

    Rs.150 Million New Pipe, Planter Mfg. Project in Indore, Madhya Pradesh

    Madhya Pradesh From 100 Million to 999 Million

    A company is planning to establish a manufacturing project in Indore, Madhya Pradesh, involving the production of pipes, planters, unbreakable water tank blow, water tank roto, and wheelbarrow. The estimated cost of the project is Rs.150 million. As of August 2022, the company is awaiting environmental clearance.

    View project
  5. Project Work Commenced Packaging / Plastics Updated

    Rs.250 Million New HDPE Pipe Mfg. Project in Indore, Madhya Pradesh

    Madhya Pradesh From 100 Million to 999 Million

    A new HDPE pipe manufacturing project with a production capacity of 15000 metric tonnes per annum, costing Rs.209.4 million, is being set up in Indore, Madhya Pradesh. The project has received consent from the state pollution control authorities and has been expanded to produce 30000 metric tonnes per annum with an investment of Rs.250 million. The project is expected to create job opportunities and contribute to the local economy. The company is committed to adhering to all environmental and safety standards.

    View project