Projects in Kerala – Page 11

629 upcoming and ongoing projects in Kerala worth ₹475,723 Cr, with investment, location, project stage and latest status. Last updated 07 Oct 2026.

Projects tracked
629
Total investment
₹475,723 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
4

Latest projects in Kerala

Showing 51–55 of 629
  1. Pre Project Stage Hospitals / Healthcare Updated

    Rs.1700 Million New ESI Hospital Construction Project in Ernakulam, Kerala

    Kerala From 1000 Million to 4999 Million

    A Rs.1700 million project for a 100-bed ESI Hospital in Ernakulam, Kerala, begins construction in October 2024, targeting completion by September 2026. As of June 2024, it's in the initial Idea Stage, with planning and feasibility studies ongoing. The project, using the EPC route, aims to bolster healthcare infrastructure, improving accessibility and services for Ernakulam residents.

    View project
  2. Under Implementation Renewable Power Projects Updated

    Rs.801 Million New Poringalkuthu Small Hydro Electric Project in Thrissur, Kerala

    Kerala From 100 Million to 999 Million

    A new hydroelectric project in Thrissur, Kerala, aims to add 24MW to an existing 24MW scheme, utilizing the same reservoir and water system with an additional 140m penstock. The combined capacity will be 48MW, with an estimated cost of Rs. 801.413 million. Construction starts in June 2025 and ends in May 2028, pending environmental clearance as of June 2024.

    View project
  3. Under Implementation Hospitals / Healthcare Updated

    Rs.5098 Million Hospital cum Medical College Expansion Project in Ernakulam, Kerala

    Kerala From 5000 Million to 49999 Million

    A Hospital cum Medical College Expansion Project in Kolenchery, Ernakulam, Kerala, by the Malankara Orthodox Syrian Church Medical Mission, includes expanding existing facilities (Medical College, Nursing College, Multispecialty Hospital with Tertiary care). Estimated at Rs. 5098.16 million, construction begins January 2025, concluding December 2029. As of June 2024, the project awaits environmental clearance from the State Level Environment Impact Assessment Authority.

    View project
  4. Under Implementation Steel Projects Updated

    Rs.469 Million New Steel Making and Rolling Mill Unit in Palakkad, Kerala

    Kerala From 100 Million to 999 Million

    A new steel making and rolling mill unit in Palakkad, Kerala, manufacturing MS billets and TMT bars. Estimated at Rs.469 million, construction starts July 2024 and ends December 2025. As of May 2024, the project is under examination for environmental clearance by the Ministry of Environment, Forest and Climate Change of India.

    View project
  5. Pre Project Stage Pharmaceuticals Projects Updated

    Rs.2000 Million New Collagen Peptide Mfg. Facility in Kochi, Kerala

    Kerala From 1000 Million to 4999 Million

    A prominent player in the field, has set its sights on establishing a cutting-edge Collagen Peptide Manufacturing Facility in Kakkanad, Kochi, Kerala. The envisioned facility is poised to revolutionize the production of Collagen Peptides, leveraging state-of-the-art technology and advanced manufacturing processes. With an estimated project cost of Rs. 2000 million,

    View project