Projects in Himachal Pradesh – Page 6

1,002 upcoming and ongoing projects in Himachal Pradesh worth ₹234,733 Cr, with investment, location, project stage and latest status. Last updated 08 Oct 2026.

Projects tracked
1,002
Total investment
₹234,733 Cr
Pre-project / Under construction
0 / 0
Added in the last 30 days
15

Latest projects in Himachal Pradesh

Showing 26–30 of 1,002
  1. Environment Clearance Stage Highways / Roads Updated

    Rs.6400 Million 4-Laning Road Upgradation Project in Bilaspur, Himachal Pradesh

    Himachal Pradesh From 5000 Million to 49999 Million

    A national highway rehabilitation and upgrading project is planned for NH205, converting the existing road to a 4-lane carriageway with paved shoulders. The stretch runs from Kalar Bala Village to Nauni Chowk, covering a design length of 17.450 km under Package IIC, executed on a Hybrid Annuity Mode basis under NH(O). The State Pollution Control Board has granted Consent to Establish for the project.

    View project
  2. Pre Project Stage Environment Updated

    Enhancement of hospital bed capacity from 720 to 1,050 beds at a medical hospital in Solan district, Himachal Pradesh.

    Himachal Pradesh From 1000 Million to 4999 Million

    A trust-run medical hospital in Himachal Pradesh is seeking environmental clearance to enhance its bed capacity from 720 to 1,050 beds within its existing premises. The proposal involves no additional construction or structural expansion, utilizing the existing built-up area of about 45,092 sqmtr on a 15,689.90 sqmtr land parcel. The proposal is currently under verification with the Ministry of Environment, Forest and Climate Change.

    View project
  3. Environment Clearance Stage Oil & Gas / Refinery Updated

    Rs.193 Million Oil Terminal Expansion Project in Una, Himachal Pradesh.

    Himachal Pradesh From 100 Million to 999 Million

    An existing oil terminal in Una is undergoing expansion with the addition of an above-ground ethanol storage tank. The facility currently handles receipt, storage and dispatch of Motor Spirit, HSD, SKO and RON booster additive. The expansion has received Consent to Establish from the State Pollution Control Board.

    View project
  4. Environment Clearance Stage Other Manufacturing Updated

    ₹256 million expansion of a transformer manufacturing unit in Una, Himachal Pradesh

    Himachal Pradesh From 100 Million to 999 Million

    The State Pollution Control Board granted Consent to Establish for the expansion of a transformer manufacturing facility in Una district, Himachal Pradesh. The expansion will raise output of distribution and power transformers with an estimated investment of about ₹256 million. The project is currently at the environment clearance stage.

    View project
  5. Environment Clearance Stage Other Chemicals Updated

    Rs.106 Million Tooth Brush Mfg. Expansion Project in Sirmour, Himachal Pradesh

    Himachal Pradesh From 100 Million to 999 Million

    The State Pollution Control Board granted Consent to Establish for expansion of an existing oral-care and cosmetics manufacturing facility at Kala-Amb, Sirmaur district. The expansion adds capacity for tooth paste, tooth brush and mouth wash lines alongside the unit's existing detergent powder, teeth whitening gel and mouthwash production. The unit is supported by boilers, DG sets and effluent/sewage treatment infrastructure, and the project currently stands at Consent to Establish stage

    View project