Bengaluru to build longest double-decker flyover for metro phase 3
The Karnataka cabinet approved a Rs. 9,700 crore project to build a 37.12-km double-decker flyover, part of Namma Metro Phase 3. The metro line will run atop the flyover, covering two corridors: 28.48