CapEx News
Project News,Updates,Bids & Tenders for Consultants,EPC Contactors,Industrial Suppliers & Service Providers
JSW Energy said it has bagged a 700 Megawatt (MW) solar project from state-owned SJVN. The project has been secured by its subsidiary JSW Neo Energy Ltd (JSW Neo) against a tariff-based competitive bid invited for setting up of 1,500 MW (Interstate Transmission System) ISTS-connected solar power projects, JSW Energy said in an exchange filing.
Following the letter of award (LoA) of 700 MW capacity from SJVN Ltd, the company’s total locked-in capacity increased to 11.0 Gigawatt (GW) comprising 1.4 GW of solar capacity, it said.
The project is required to supply power of full contracted capacity within 24 months from the effective date of the Power Purchase Agreement (PPA).
Further, JSW Energy said it has a total locked-in generation capacity of 11.0 GW, which includes 7.2 GW in operation, 2.6 GW under construction in wind, thermal, and hydro, and LoAs for 1.2 GW capacity from SECI (Tranche – XVI) and SJVN.
In addition, the company has 3.4 GWh of locked-in energy storage capacity by means of a battery energy storage system and hydro-pumped storage project.
The company expects to have 9.8 GW of operational generation capacity by CY2024, up from the current operational capacity of 7.2 GW.
Recent News
◉ PennWhite to build a new manufacturing plant in India - Apr 02,2025◉ Vedanta to set up aluminium park in Odisha's Jharsuguda - Apr 02,2025
◉ Solar Energy Corporation of India issues LoA for Tranche-II Green Hydrogen project - Apr 02,2025
◉ NHPC Ltd to soon resume investment work of Kuppa Pumped Storage Project - Apr 02,2025
◉ AP Minister Nara Lokesh lays foundation stone for Rs135 crore CBG plant by Reliance - Apr 02,2025
◉ Inox Air Products commissions green hydrogen plant at Asahi India’s Soniyana - Apr 02,2025
◉ KP Green Engineering secures Rs. 756.40 crore orders across multiple sectors - Apr 02,2025