New & Upcoming Projects In India
A Complete list of all Power Projects, Chemical Projects, Steel Projects, Cement Projects, Paper Projects, Sugar & Distillery Projects, Fertilizer Projects, Refinery Projects, Water Treatment Projects in India

Rs.850 Million New Multi Use Zone Industrial Park in Rangareddy, Telangana
Executive Summary: A new Multi Use Zone Industrial Park is planned for development in Kancha Gachibowli, Serlingampally, Rangareddy, Telangana, spanning 122.63 acres. The project, estimated at Rs. 850 million, has received consent from state pollution control authorities for establishment. Construction is set to contribute to regional industrial growth and infrastructure development.
-
Industry: Infrastructure
State: Telangana
Investment Range: From 100 Million to 999 Million
03 April 2025

New Painting Booth and STP Installation Project in Sangareddy, Telangana
Executive Summary: A company is planning a new project in Pashamailaram, Telangana, focusing on the installation of an additional painting booth and sewage treatment plant (STP). The project is estimated to cost Rs. 95.5 million. As of April 2025, the company has received approval from the state pollution control authorities to proceed with the expansion.
-
Industry: Manufacturing
State: Telangana
Investment Range: Less than 100 Million
03 April 2025

Rs.146 Million New Matel Recovery Unit in Rangareddy, Telangana
Executive Summary: A new Metal Recovery Unit is planned in EMC Maheshwaram, Rangareddy, Telangana, with production of Lithium Carbonate (0.65 TPD) and Precursor Cathode Active Materials (2.5 TPD). The project, estimated to cost Rs. 146.2 million, has received consent from the state pollution control authorities as of April 2025, aiming to support the growing demand for materials in energy storage and electric vehicles.
-
Industry: Metallurgical Industries
State: Telangana
Investment Range: From 100 Million to 999 Million
01 April 2025

Rs.463 Million New Data Center Construction Project in Rangareddy, Telangana
Executive Summary: A new data center is planned in Masjid Banda, Kondapur, Rangareddy, Telangana, with a total built-up area of 12,133.92 square meters across a ground floor, mezzanine floor, and two upper floors. The project is estimated to cost Rs. 463.2 million, and as of April 2025, it has received consent from the state pollution control authorities to proceed.
-
Industry: Infrastructure
State: Telangana
Investment Range: From 100 Million to 999 Million
01 April 2025

Rs.1500 Million Pharmaceuticals Expansion Project in Sangareddy, Telangana
Executive Summary: A pharmaceutical company plans to expand its manufacturing capacity in Telangana with a project that aims to increase the production of pharmaceuticals products to 5050 kg/day. The company has received consent from the state pollution control authorities to establish the project, which is expected to create job opportunities and contribute to the growth of the pharmaceutical industry in the region. The expansion project is a significant investment for the company and is expected to increase its operational efficiency and market share.
-
Industry: Chemicals
State: Telangana
Investment Range: From 1000 Million to 4999 Million
31 March 2025

Pharmaceutical Products Mfg. Expansion Unit in Ranga Reddy, Telangana
Executive Summary: A pharmaceutical manufacturing expansion project is planned in Mankal, Rangareddy, Telangana. The project involves producing a variety of pharmaceutical ingredients, API intermediates, and specialty chemicals. Construction activity is scheduled to start in November 2023 and end in November 2025. As of May 2023, the company has obtained consent from state pollution control authorities to proceed with the project.
-
Industry: Chemicals
State: Telangana
Investment Range: Less than 100 Million
31 March 2025

Rs.201 Million New Composite Hollow Insulators Mfg. Project in Sangareddy, Telangana
Executive Summary: A new composite hollow insulator manufacturing unit is planned in Sultanpur, Telangana, with a capacity of 167 units per month. The ₹201 million project aims to support the power and electrical industries. As of March 2025, state pollution control authorities have granted consent to establish the facility, ensuring compliance with environmental regulations.
-
Industry: Manufacturing
State: Telangana
Investment Range: From 100 Million to 999 Million
27 March 2025

Rs.360 Million New Solar PV Inverters Mfg. Project in Rangareddy, Telangana
Executive Summary: A new solar PV inverters manufacturing project is planned in Maheshwaram, Telangana, by Medha Servo Drives. With a capacity of 2000 Units/Annum for solar PV inverters and 25 Units/Month for driver control units and loco control units, the project's estimated cost is Rs. 360.013 million. Consent from state pollution control authorities has been obtained as of February 2024.
-
Industry: Manufacturing
State: Telangana
Investment Range: From 100 Million to 999 Million
26 March 2025

Mineral Stack Yard / Railway Sliding Development Project in Bhadradri Kothagudem, Telangana
Executive Summary: A new mineral stack yard and railway siding project is planned in Regalla (V), Laxmidevipally, Bhadradri Kothagudem, Telangana, with a capacity of 2 lakh TPA. With an estimated investment of ₹54.186 million, the project aims to enhance mineral storage and transportation. As of March 2025, it has received approval from state pollution control authorities for establishment.
-
Industry: Mining
State: Telangana
Investment Range: Less than 100 Million
25 March 2025

Rs.299 Million New Lithium Based Products Mfg. Unit Expansion Project in Sangareddy, Telangana
Executive Summary: lithium-based products manufacturing unit in Patancheru, Telangana. The expansion aims to increase production capacity from 10.0 TPM to 50.0 TPM on a 4.027-acre (1.6296 Ha.) site, with an estimated project cost of Rs. 200 million. Construction is scheduled to run from October 2024 to May 2025. As of September 2023, the project has received approval from the Ministry of Environment, Forest, and Climate Change and has been referred to the Expert Appraisal Committee.
-
Industry: Manufacturing
State: Telangana
Investment Range: From 100 Million to 999 Million
25 March 2025