New & Upcoming Projects In India
A Complete list of all Power Projects, Chemical Projects, Steel Projects, Cement Projects, Paper Projects, Sugar & Distillery Projects, Fertilizer Projects, Refinery Projects, Water Treatment Projects in India

Rs.792 Million New Dairy Unit in Chittoor, Andhra Pradesh
Executive Summary: A new dairy unit is set to be established in Chittoor, Andhra Pradesh, with a capacity of 50,000 LPD of milk, 5,500 LPD of dahi, 20,000 LPD of buttermilk, 13,700 kg/day of paneer, and sweets. With an investment of ₹792 million, the project has secured environmental clearance as of March 2025, paving the way for implementation.
-
Industry: Food Processing
State: Andhra Pradesh
Investment Range: From 100 Million to 999 Million
17 March 2025

New Coal Washery Project in Bilaspur, Chhattisgarh
Executive Summary: A new coal washery project is planned in Beltara, Tehsil - Belha, Bilaspur, Chhattisgarh, involving a technology upgrade from a dry-type to a wet-type coal washery with a capacity of 1.20 million tonnes per annum. This modernization aims to enhance efficiency and environmental compliance. As of March 2025, the project has received approval from state pollution control authorities.
-
Industry: Mining
State: Chhattisgarh
Investment Range: NA
17 March 2025

M.S. Pipe Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new M.S. Pipe manufacturing project is planned in Industrial Area Siltara, Phase-II, Raipur, Chhattisgarh. It includes the production of M.S. Pipes (60,000 M.T./Year), Tube or Pipe Fittings (30,000 M.T./Year), Re-Rolled Products (59,900 M.T./Year), and Scrap Packaging (40,000 M.T./Year). With an estimated investment of ₹
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
17 March 2025

New Metal Pipe and Rubber Hose Mfg. Project in Satara, Maharashtra
Executive Summary: A new manufacturing project for metal pipes, rubber hoses, molded parts, and plastic components is set to be established in MIDC Phase I, Kersidi, Khandala, Satara, Maharashtra. With an annual production capacity of various components, the project is estimated to cost ₹85.7 million. As of March 2025, environmental clearance has been obtained for implementation.
-
Industry: Manufacturing
State: Maharashtra
Investment Range: Less than 100 Million
17 March 2025

New Rubber and Plastic Products Mfg. Project in Pune, Maharashtra
Executive Summary: A new rubber and plastic products manufacturing project is planned in Chakan Industrial Area, Phase-II, Khed, Pune, Maharashtra, with a production capacity of 5,000 kg per month. The project is estimated to cost ₹88.624 million. As of March 2025, state pollution control authorities have granted consent for its establishment.
-
Industry: Manufacturing
State: Maharashtra
Investment Range: Less than 100 Million
17 March 2025

MS Billets Mfg. Expansion Project in Raipur, Chhattisgarh
Executive Summary: A new MS Billets manufacturing expansion project is planned in Tanda and Mohdi, Mohdi Road, Block-Dharsiwa, Raipur, Chhattisgarh. The project will increase MS Billets capacity from 33,600 MTPA to 58,806 MTPA by upgrading the induction furnace and adding a rolling mill with a 57,922 MTPA capacity. As of March 2025, the project has received state pollution control approval.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
17 March 2025

Rs.138 Million Pharma Products Mfg. Expansion Project in Solan, Himachal Pradesh
Executive Summary: A new pharmaceutical manufacturing facility is being developed in EPIP Phase-I, Jharmajri, Solan, Himachal Pradesh. The project includes producing tablets, capsules, sachets, and dry syrup, with an investment of Rs. 138.015 million. Approved in June 2023, construction began in July 2023 and is ongoing as of March 2025 to expand production capacity.
-
Industry: Chemicals
State: Himachal Pradesh
Investment Range: From 100 Million to 999 Million
14 March 2025

Rs.3500 Million New Garments Mfg. Project in Cuttack, Odisha
Executive Summary: A new garments manufacturing facility is being established in Ramdaspur, Cuttack, Odisha, covering 28.047 acres. It will produce 2.4 crore pieces of garments, socks, and elastic annually, with an investment of Rs. 3,500 million. The project received environmental clearance in July 2020 and is progressing as of March 2025.
-
Industry: Textiles
State: Odisha
Investment Range: From 1000 Million to 4999 Million
14 March 2025

Rs.2680 Million New Grain Based Distillery Plant in SPSR Nellore, Andhra Pradesh
Executive Summary: A new grain-based distillery plant is planned in APIIC Industrial Park, SPSR Nellore, Andhra Pradesh, featuring a co-generation power facility. The project aims to produce 200 KL/day of ethanol and generate 4.8 MW of power, with an estimated investment of ₹2,680 million. As of March 2025, it has received environmental clearance for establishment.
-
Industry: Distillery
State: Andhra Pradesh
Investment Range: From 1000 Million to 4999 Million
14 March 2025

Rs.344 Million Chemical Mfg. Expansion Project in Anakapalli, Andhra Pradesh
Executive Summary: A chemical manufacturing expansion project is planned in Parawada Mandal, Anakapalli, Andhra Pradesh, aiming to increase production capacity to 30,015 kg/day. With an estimated investment of ₹344.9 million, the project will enhance operational capabilities. As of March 2025, the necessary approvals from state pollution control authorities have been secured, marking progress toward implementation.
-
Industry: Chemicals
State: Andhra Pradesh
Investment Range: From 100 Million to 999 Million
14 March 2025