New & Upcoming Projects In India
A Complete list of all Power Projects, Chemical Projects, Steel Projects, Cement Projects, Paper Projects, Sugar & Distillery Projects, Fertilizer Projects, Refinery Projects, Water Treatment Projects in India

Rs.360 Million New Solar PV Inverters Mfg. Project in Rangareddy, Telangana
Executive Summary: A new solar PV inverters manufacturing project is planned in Maheshwaram, Telangana, by Medha Servo Drives. With a capacity of 2000 Units/Annum for solar PV inverters and 25 Units/Month for driver control units and loco control units, the project's estimated cost is Rs. 360.013 million. Consent from state pollution control authorities has been obtained as of February 2024.
-
Industry: Manufacturing
State: Telangana
Investment Range: From 100 Million to 999 Million
26 March 2025

New Cotton and Synthetics Fabrics Mfg. Project in Kolhapur, Maharashtra
Executive Summary: A new cotton and synthetic fabrics manufacturing project is planned in Tardal, Hatkanangale, Kolhapur, Maharashtra, with a capacity of 13 lakh meters per year. With an estimated investment of ₹49.1 million, the project aims to boost textile production. As of March 2025, it has received approval from state pollution control authorities for establishment.
-
Industry: Textiles
State: Maharashtra
Investment Range: Less than 100 Million
25 March 2025

Rs.2810 Million New Fishery Harbour Development Project in Maharashtra
Executive Summary: A new fishery harbor development project is planned in Satpati, Palghar, Maharashtra, with a fish handling capacity of 16,451 tons per year. The initiative aims to enhance fishing infrastructure and support the local seafood industry. With an estimated investment of ₹2,810.4 million, the project has received environmental clearance as of March 2025 for establishment.
-
Industry: Infrastructure
State: Maharashtra
Investment Range: From 1000 Million to 4999 Million
25 March 2025

Rs.165 Million Color Concentrates Mfg. Project in Thane, Maharashtra
Executive Summary: A new color concentrates manufacturing project is planned in TTC Industrial Area, MIDC Rabale, Navi Mumbai, Thane, Maharashtra. The facility will produce 300 metric tons per month of color concentrates for FRP, flooring, coatings, epoxy, and polyurethane applications. With an estimated investment of ₹165 million, the project has received consent from state pollution control authorities as of March 2025.
-
Industry: Chemicals
State: Maharashtra
Investment Range: From 100 Million to 999 Million
25 March 2025

Rs.289 Million New Conductor and Cabel Mfg. Unit in Purba Medinipur, West Bengal
Executive Summary: A new conductor and cable manufacturing unit is planned in Vidyasagar Industrial Park, Kharagpur, West Bengal. The project includes producing AAC/AAAC/ACSR/AL59 conductors (1,000 MT/month), railway sliding/squad cables (100 MT/month), and HT/LT power conductor cables (1,400 MT/month). With an estimated investment of ₹289.4 million, the project has received state pollution control approval as of March 2025.
-
Industry: Manufacturing
State: West Bengal
Investment Range: From 100 Million to 999 Million
25 March 2025

Rs.299 Million New Lithium Based Products Mfg. Unit Expansion Project in Sangareddy, Telangana
Executive Summary: lithium-based products manufacturing unit in Patancheru, Telangana. The expansion aims to increase production capacity from 10.0 TPM to 50.0 TPM on a 4.027-acre (1.6296 Ha.) site, with an estimated project cost of Rs. 200 million. Construction is scheduled to run from October 2024 to May 2025. As of September 2023, the project has received approval from the Ministry of Environment, Forest, and Climate Change and has been referred to the Expert Appraisal Committee.
-
Industry: Manufacturing
State: Telangana
Investment Range: From 100 Million to 999 Million
25 March 2025

New Coal Mining Project in Raigarh, Chhattisgarh
Executive Summary: A new coal mining project is planned in Rodopali, Mudgaon, Dholnara, Chitwahi, and Bhalumuda, Tehsil - Tamnar, Raigarh, Chhattisgarh. The project includes the Gare Palma Sector-II Coal Mine with a capacity of 23.60 MTPA (22.0 MTPA open-cast, 1.6 MTPA underground) over 30.243 hectares. As of March 2025, it has received state pollution control approval for establishment.
-
Industry: Mining
State: Chhattisgarh
Investment Range: NA
25 March 2025

Mineral Stack Yard / Railway Sliding Development Project in Bhadradri Kothagudem, Telangana
Executive Summary: A new mineral stack yard and railway siding project is planned in Regalla (V), Laxmidevipally, Bhadradri Kothagudem, Telangana, with a capacity of 2 lakh TPA. With an estimated investment of ₹54.186 million, the project aims to enhance mineral storage and transportation. As of March 2025, it has received approval from state pollution control authorities for establishment.
-
Industry: Mining
State: Telangana
Investment Range: Less than 100 Million
25 March 2025

Sewage Treatment Plant Installation Project in South Goa, Goa
Executive Summary: A new iron ore pellet manufacturing project is planned near Borim Bridge, Shiroda, South Goa, with a target capacity of 1.8 MTPA. Feasibility studies, design finalization, and regulatory approvals have been underway since 2023. As of March 2025, the project includes a 10 KLD Sewage Treatment Plant and has received state pollution control clearance for establishment.
-
Industry: Environment
State: Goa
Investment Range: NA
25 March 2025

New Refrigerator, AC and Washing Machine Parts Mfg. Project in Maharashtra
Executive Summary: A new manufacturing project for refrigerator, AC, washing machine, and Qube parts is planned in Khandala, Satara, Maharashtra, with a production capacity of 179,753, 273,339, 8,936, and 6,987 units per month, respectively. The project, costing ₹45.6 million, has received approval from the state pollution control authorities as of March 2025.
-
Industry: Manufacturing
State: Maharashtra
Investment Range: Less than 100 Million
24 March 2025