Hospital Expasion Project in Cuttack, Odisha
Executive Summary: A new hospital expansion project is planned in Cuttack Sadar, Cuttack, Odisha, featuring a basement, ground floor, and seven additional floors with a capacity of 200 beds. The project aims to enhance medical facilities in the region. As of March 2025, it has received approval from state pollution control authorities for establishment.
-
Industry: Hospitality and Healthcare
State: Odisha
Investment Range: NA
14 March 2025

New Surgical Products Mfg. Project in Cuttack, Odisha
Executive Summary: A new surgical products manufacturing project is coming up in Baranga, Bramhanigaon, Cuttack, Odisha. It will produce Absorbent Cotton, Bandages, Surgical Gowns, Masks, Caps, and Shoe Covers with a capacity of 360 MT per year. As of March 2025, the project has received approval from state pollution control authorities for establishment.
-
Industry: Manufacturing
State: Odisha
Investment Range: NA
14 March 2025

Rs.3500 Million New Garments Mfg. Project in Cuttack, Odisha
Executive Summary: A new garments manufacturing facility is being established in Ramdaspur, Cuttack, Odisha, covering 28.047 acres. It will produce 2.4 crore pieces of garments, socks, and elastic annually, with an investment of Rs. 3,500 million. The project received environmental clearance in July 2020 and is progressing as of March 2025.
-
Industry: Textiles
State: Odisha
Investment Range: From 1000 Million to 4999 Million
14 March 2025

Rs.1800 Million Multimodal Logistics Park Project in Jagatsinghpur, Odisha
Executive Summary: A company is developing a rail-linked container terminal and multimodal logistics park in Paradeep, Odisha, to support various industries. Approved in 2014, the project includes a seven-line railway siding over 100 acres with a 15,324 sq. m built-up area, costing ₹1,800 million. It has secured environmental clearance as of March 2025.
-
Industry: Infrastructure
State: Odisha
Investment Range: From 1000 Million to 4999 Million
13 March 2025

Rs.4980 Million Steel Plant Expansion Project in Sundargarh, Odisha
Executive Summary: A Steel Plant Expansion Project in Sundargarh, Odisha, includes installing DRI plants, a coal washery, induction and ladle furnaces, and a steel rolling mill. The project will use local iron ore, dolomite, and coal. With environmental clearance and state pollution control consent, the project also includes installing DG sets with an investment of Rs. 52.7 million as of July 2024.
-
Industry: Metallurgical Industries
State: Odisha
Investment Range: From 1000 Million to 4999 Million
13 March 2025

Rs.3500 Million Jharsuguda Cement Works Expansion Project in Jharsuguda, Odisha
Executive Summary: A cement manufacturer plans to expand production at its Jharsuguda facility in Odisha, increasing capacity from 4 MTPA to 5.1 MTPA. The project includes installing a 1400 TPD truck tippler and diesel generator sets. With an investment of Rs. 46.4 million, the expansion will later increase capacity to 8.1 MTPA by 2028, with environmental clearance pending.
-
Industry: Building Materials
State: Odisha
Investment Range: Less than 100 Million
11 March 2025

Rs.16101 Million Upper Kolab Hydel Power in Koraput, Odisha
Executive Summary: The State Government is planning to take up Upper Kolab hydel power in Koraput, Odisha. The project involves development Kolab hydel power.
-
Industry: Power Generation
State: Odisha
Investment Range: From 5000 Million to 49999 Million
07 March 2025

Rs.4750 Million Phosphoric Acid Plant Expansion Project in Jagatsinghpur, Odisha
Executive Summary: A phosphoric acid plant in Odisha plans a 1,000 to 1,400-ton daily capacity expansion to meet industry demands. They've partnered with a global engineering firm, aiming for completion in 22 months, with pre-project activities underway since November 2019.
-
Industry: Chemicals
State: Odisha
Investment Range: From 1000 Million to 4999 Million
06 March 2025

Rs.4731 Million New Coal Handling Plant in Odisha
Executive Summary: A new coal handling plant is planned in Lakhanpur Area, IB Valley Coalfields, Odisha. The project includes a re-engineered turnkey execution with a SILO loading arrangement. It covers design, supply, erection, commissioning, trial runs, testing, and operation and maintenance during the defect liability period (DLP). The estimated cost is Rs. 4731 million, with a tender floated in March 2025.
-
Industry: Mining
State: Odisha
Investment Range: From 1000 Million to 4999 Million
05 March 2025

Rs.55000 Million New Green Ammonia Production Unit in Jagatsinghpur, Odisha
Executive Summary: A new green ammonia production unit is planned in Siju and Rangiagarh, Paradip, Odisha, with a production capacity of 900 TPD. The project, estimated to cost Rs. 55,000 million, aims to support sustainable agriculture and energy. As of March 2025, the company has received consent from state pollution control authorities to establish the facility.
-
Industry: Chemicals
State: Odisha
Investment Range: More than 49999 Million