New Metallurgical Industries Industries In India
A complete list of greenfield steel plants, iron & steel casting units, copper smelters, alumina refineries, ferro alloy projects, fabricated , metal products, iron and steel pipes and other non ferrous metal manufacturing projects.

Rs.350 Million MS Billets Expansion Project in Paschim Bardhaman, West Bengal
Executive Summary: A steel manufacturing company in Paschim Bardhaman, West Bengal, is expanding its MS Billets production from 135,000 TPA to 162,000 TPA by adding a 25-tonne induction furnace. The project also includes upgrading the rolling mill, installing a slag crusher unit, and enhancing the captive power plant. Estimated at Rs. 350 million, construction will run from May 2025 to February 2026.
-
Industry: Metallurgical Industries
State: West Bengal
Investment Range: From 100 Million to 999 Million
21 February 2025

Rs.254 Million Gas Plant Installation Project in Sundargarh, Odisha
Executive Summary: A new gas plant installation project is planned in Sundargarh, Odisha, featuring three coal gasifiers with a total capacity of 22,500 Nm³/hr. With an estimated investment of Rs. 254.64 million, the project has received consent from state pollution control authorities as of February 2025, aiming to enhance industrial energy efficiency and regional development.
-
Industry: Metallurgical Industries
State: Odisha
Investment Range: From 100 Million to 999 Million
21 February 2025

Rs.2400 Million New DRI based Steel Mfg. Plant in Raigarh, Chhattisgarh
Executive Summary: A new DRI-based steel manufacturing plant is planned in Pali, Chhattisgarh. The project includes two 200 TPD DRI kilns, 10 MW WHRB boilers, two submerged arc furnaces, and a 20 MW AFBC captive power plant. Additionally, a facility for fly ash bricks production will be established. The estimated project cost is Rs. 2400 million. Environmental clearance is being sought from the Ministry of Environment, Forest and Climate Change.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: From 1000 Million to 4999 Million
20 February 2025

Rs.6200 Million DRI Plant Expansion Project in Sundargarh, Odisha
Executive Summary: A significant expansion of a Direct Reduced Iron (DRI) plant in Kalunga Industrial Estate, Odisha, is underway. The project aims to increase DRI plant capacity, upgrade the captive power plant, and enhance several plant facilities. With an investment of Rs. 3,111.2 million, construction will begin in May 2025 and finish by January 2027, pending environmental clearance.
-
Industry: Metallurgical Industries
State: Odisha
Investment Range: From 5000 Million to 49999 Million
19 February 2025

Rs.540000 Million New Integrated Steel Plant in Koppal, Karnataka
Executive Summary: A new integrated steel plant is being planned in Koppal, Karnataka, with an annual production capacity of 10.50 million tonnes. The project is estimated to cost Rs.540,000 million and is expected to significantly enhance steel production in the region. As of February 2025, the company has officially announced the project.
-
Industry: Metallurgical Industries
State: Karnataka
Investment Range: More than 49999 Million
18 February 2025

Rs.5850 Millin Pig Iron Mfg. Expansion Project in Saraikela - Kharsawan, Jharkhand
Executive Summary: A Jharkhand-based company plans to expand its pig iron production to 450 tons per day and sinter to 600 tons per day, while generating 4 MW of power. The ₹5 billion project includes replacing sinter and blast furnaces, enhancing power capacity, and installing additional facilities. Construction starts in February 2026, with completion by January 2027, awaiting environmental clearance.
-
Industry: Metallurgical Industries
State: Jharkhand
Investment Range: From 1000 Million to 4999 Million
17 February 2025

Rs.125 Million Hot Charged Rolling Mill Expansion Project in Raipur, Chhattisgarh
Executive Summary: Expanding a hot charged rolling mill in Chhattisgarh with an estimated cost of Rs. 125 million. Annual capacity: 57,670 tons, plus eco-friendly initiatives.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: From 100 Million to 999 Million
14 February 2025

MS Black Pipe/Sections Fabrication Project in Raipur, Chhattisgarh
Executive Summary: A Leading Steel Company is planning to take up steel plant expansion project Raipur, Chhattisgarh. The project involves expanding m.s. ingot / billets (through induction furnaces) and/or wire rod (through hot charging of ms billet in rolling mill) (from 70000 TPA to 157500 TPA),etc.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: From 1000 Million to 4999 Million
12 February 2025

Steel Melting Plant Expansion Project in Tiruvallur, Tamil Nadu
Executive Summary: A steel melting plant and rolling mill expansion project is planned in Peddikuppam, Tiruvallur, Tamil Nadu, with an investment of Rs. 50.61 million. It includes a 12 T/Heat induction furnace and a 15 MT billet caster, increasing production capacity. Construction is set from May 2025 to May 2026, pending environmental clearance.
-
Industry: Metallurgical Industries
State: Tamil Nadu
Investment Range: Less than 100 Million
12 February 2025

Ferro Vanadium Mfg. Expansion Project in Raigarh, Chhattisgarh
Executive Summary: A Ferro Vanadium manufacturing expansion in Rabo, Tehsil-Tamnar, Raigarh, Chhattisgarh, will enhance production of Ferro Vanadium (10,000 MT/Y), Ferro Molybdenum (10,000 MT/Y), and Calcined Petroleum Coke (24,000 MT/Y). Approved by state pollution authorities as of February 2025, the project aims to strengthen the steel and alloy supply chain, boost employment, and drive regional industrial growth.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
12 February 2025