New & Upcoming Projects In India
A Complete list of all Power Projects, Chemical Projects, Steel Projects, Cement Projects, Paper Projects, Sugar & Distillery Projects, Fertilizer Projects, Refinery Projects, Water Treatment Projects in India

Sipat Super Thermal Power Project Stage - III in Bilaspur, Chhattisgarh
Executive Summary: A super thermal power project expansion is planned in P.O. - Sipat, Tehsil Masturi, Bilaspur, Chhattisgarh, increasing capacity from 2,980 MW to 3,780 MW with the addition of an 800 MW unit. As of March 2025, the project has received consent from state pollution control authorities, ensuring compliance with environmental regulations for further development.
-
Industry: Power Generation
State: Chhattisgarh
Investment Range: NA
19 March 2025

New MS Pipe Round Square Mfg. Project in Raigarh, Chhattisgarh
Executive Summary: A new manufacturing facility for MS pipes and fabricated structures is planned in Gharghoda Road, Village-Taraimal, Raigarh, Chhattisgarh. The project includes producing 150,000 metric tonnes per year of MS round, square, and rectangular pipes, along with 150,000 metric tonnes per year of MS fabricated structures. As of March 2025, it has received approval from state pollution control authorities.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
18 March 2025

Iron Ore Pellet Expansion Project in Raipur, Chhattisgarh
Executive Summary: A new iron ore pellet expansion project is planned in Industrial Growth Centre, Siltara (Phase-I), Raipur, Chhattisgarh. The project includes increasing iron ore pellet production by 1.5 million tonnes per year and setting up a producer gas plant with a 1,16,000 cubic meters per hour capacity. As of March 2025, state pollution control authorities have granted consent for implementation.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
18 March 2025

M.S. Pipe Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new M.S. Pipe manufacturing project is planned in Industrial Area Siltara, Phase-II, Raipur, Chhattisgarh. It includes the production of M.S. Pipes (60,000 M.T./Year), Tube or Pipe Fittings (30,000 M.T./Year), Re-Rolled Products (59,900 M.T./Year), and Scrap Packaging (40,000 M.T./Year). With an estimated investment of ₹
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
17 March 2025

New Coal Washery Project in Bilaspur, Chhattisgarh
Executive Summary: A new coal washery project is planned in Beltara, Tehsil - Belha, Bilaspur, Chhattisgarh, involving a technology upgrade from a dry-type to a wet-type coal washery with a capacity of 1.20 million tonnes per annum. This modernization aims to enhance efficiency and environmental compliance. As of March 2025, the project has received approval from state pollution control authorities.
-
Industry: Mining
State: Chhattisgarh
Investment Range: NA
17 March 2025

MS Billets Mfg. Expansion Project in Raipur, Chhattisgarh
Executive Summary: A new MS Billets manufacturing expansion project is planned in Tanda and Mohdi, Mohdi Road, Block-Dharsiwa, Raipur, Chhattisgarh. The project will increase MS Billets capacity from 33,600 MTPA to 58,806 MTPA by upgrading the induction furnace and adding a rolling mill with a 57,922 MTPA capacity. As of March 2025, the project has received state pollution control approval.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
17 March 2025

Sponge Iron Mfg. Project in Bemetara, Chhattisgarh
Executive Summary: A steel manufacturing company plans to develop a Sponge Iron Manufacturing Project in Bemetara, Chhattisgarh. The project includes DRI kilns, an induction furnace, rerolled steel production, a 25 MW captive power plant, a ferro alloy unit, fly ash brick production, and a coal gasifier. As of March 2025, it has received environmental clearance to proceed.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
13 March 2025

Solar EVE Sheet Mfg. Expansion Project in Raipur, Chhattisgarh
Executive Summary: A solar manufacturing company plans to expand its Solar EVE Sheet production capacity in Seoni, Tehsil Arang, Raipur, Chhattisgarh, increasing output from 3,000 to 6,000 metric tonnes per year. As of March 2025, the project has received consent from state pollution control authorities, supporting the growing demand for renewable energy components.
-
Industry: Manufacturing
State: Chhattisgarh
Investment Range: NA
07 March 2025

Rs.650 Million New Coalbed Methane (CBM) Exploration Project in Koriya, Chhattisgarh
Executive Summary: A new Coalbed Methane (CBM) exploration project is planned in Manendragarh Chirimiri Bharatpur, Koriya, Chhattisgarh. The project involves drilling 24 exploratory coreholes and test wells in Block SR-ONHP (CBM)-2022/6. With an estimated cost of Rs. 650 million, construction will start in June 2025 and end in July 2029. As of March 2025, the project is under review for environmental clearance.
-
Industry: Petroleum
State: Chhattisgarh
Investment Range: From 100 Million to 999 Million
04 March 2025

New Ferro Manganese Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new ferroalloy and metallurgical manufacturing project is planned in Raipur, Chhattisgarh, producing Ferro Manganese, Ferro Molybdenum, Ferro Vanadium, Cobalt Sulphate, Sodium Sulphate Ammonium Oxide, and more. With a diverse production capacity, the project aims to enhance industrial growth. As of February 2025, it has received consent from state pollution control authorities for establishment.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
25 February 2025