New & Upcoming Projects In India
A Complete list of all Power Projects, Chemical Projects, Steel Projects, Cement Projects, Paper Projects, Sugar & Distillery Projects, Fertilizer Projects, Refinery Projects, Water Treatment Projects in India

Rs.136000 Million Raigarh Thermal Power Plant Expansion Project in Raigarh, Chhattishgarh
Executive Summary: The Raigarh Thermal Power Plant Expansion Project aims to increase capacity from 600 MW to 2200 MW by adding 1600 MW of Ultra Super Critical Technology. Located in Tehsil Pussore, Raigarh, Chhattisgarh, the Rs. 136,000 million project will begin construction in December 2024 and finish by May 2029. Environmental clearance is currently under review.
-
Industry: Power Generation
State: Chhattisgarh
Investment Range: More than 49999 Million
06 September 2024

New Ingots/Billets Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new steel manufacturing project is set to launch in the Urla Industrial Area, Raipur, Chhattisgarh. The facility will produce 59,900 metric tons of ingots and billets annually, along with 30,000 metric tons of re-rolled products per year. As of September 2024, it has received consent from the state pollution control authorities.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
06 September 2024

Induction Furnace Capacity Expansion Project in Bilaspur, Chhattishgarh
Executive Summary: A steel Industrial Company is expanding its Induction Furnace capacity at Silpahri Industrial Area, Bilaspur, Chhattisgarh. The upgrade will increase capacity from 35,770 to 59,900 tonnes per year by adding an 8 Tonne unit and expanding the Continuous Casting Machine and Hot Charged Rolling Mill. The project has received environmental clearance as of September 2024.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
05 September 2024

New Installation of Additional Boiler Plant in Raipur, Chhattisgarh
Executive Summary: A steel Company is expanding its facility in Urla Industrial Area, Raipur, Chhattisgarh, with a new 2.5 tonne/hour boiler and increasing Ferro Alloys production capacity from 9,000 MT/year to 18,000 MT/year, investing Rs. 69.9 million. Construction will start in December 2024 and end by March 2025. The project is pending environmental clearance from the Ministry of Environment.
-
Industry: Equipment
State: Chhattisgarh
Investment Range: NA
05 September 2024

Automobile Component, Spare Parts Mfg. Expansion Project in Durg, Chhattisgarh
Executive Summary: An expansion project for automobile component and spare parts manufacturing is planned in Engineering Park, Hathkhoj, Bhilai, with a capacity of 30,000 MT/A. As of September 2024, state pollution control authorities have granted consent for the project.
-
Industry: Automotive Industries
State: Chhattisgarh
Investment Range: NA
04 September 2024

New Cold Rolled Products Mfg. Project in Raipur, Chhattishgarh
Executive Summary: A new Cold Rolled Products manufacturing project is planned in Raipur, Chhattisgarh, featuring facilities for Annealing, Pickling, Continuous Galvanizing, and Cold Rolled Products, each with a 58,000 metric tonnes per year capacity. The project aims to produce galvanized strips, sheets, and HRAP products. As of September 2024, the company has secured approval from state pollution control authorities.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
03 September 2024

New Plastic Pipes Mfg. Project in Raipur, Chhattisgarh
Executive Summary: A new manufacturing project in Sejbahar, Raipur, Chhattisgarh, is set to produce plastic pipes, plastic sutli, and plastic tubes with capacities of 75 MT/Y, 50 MT/Y, and 200 MT/Y, respectively. The project has received approval from state pollution control authorities as of August 2024, allowing it to move forward with its establishment.
-
Industry: Manufacturing
State: Chhattisgarh
Investment Range: NA
26 August 2024

Rs.1100 Million Steel Plant Expansion Project in Raipur, Chhattisgarh
Executive Summary: A major steel plant expansion in Raipur, Chhattisgarh, involves increasing capacities for sponge iron, induction furnace, rolling mill, and WHRB power plant, as well as establishing a new pellet plant. Estimated at Rs. 1,100 million, construction will start in June 2025 and finish by August 2028. Environmental clearance is under review by the Ministry of Environment.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: From 1000 Million to 4999 Million
23 August 2024

Coal Washery Expansion Project in Bilaspur, Chhattishgarh
Executive Summary: A coal washery expansion project is planned in Bilaspur, Chhattisgarh, increasing the capacity of Washery Unit-II from 0.96 MTPA to 2.48 MTPA, using 19.53 acres. As of August 2024, consent from the state pollution control authorities has been obtained. The expansion aims to enhance processing capacity and contribute to regional industrial growth.
-
Industry: Mining
State: Chhattisgarh
Investment Range: NA
22 August 2024

Sponge Iron Mfg. Expansion Project in Bilaspur, Chhattishgarh
Executive Summary: An expansion project in Sirgitti Industrial Area, Bilaspur, Chhattisgarh, will increase sponge iron production from 60,000 TPA to 200,000 TPA. It includes new units for MS Billets, rerolled steel products, MS Black Pipes, galvanized steel, and power plants, with additional Fly Ash Brick production. The project, with state pollution control consent as of August 2024, will also feature a WHRB Power Plant and an AFBC Power Plant.
-
Industry: Metallurgical Industries
State: Chhattisgarh
Investment Range: NA
21 August 2024