CapEx News
Project News,Updates,Bids & Tenders for Consultants,EPC Contactors,Industrial Suppliers & Service Providers
KMC to establish 10 MGD water treatment plant on eastern flank of EM Bypass
Environment - Mar 18,2024 -Kolkata Municipal Corporation (KMC) is planning to set up a water treatment plant of 10 million gallons per day (MGD) on EM Bypass near the junction of Garia Station Road on a turnkey basis.
According to KMC, presently the vast area of the Boroughs X,XI and XII is partly supplied through surface water from Garden Reach Water Works and Dhapa water treatment plant through different booster pumping stations (BPS), capsule BPS and elevated storage reservoir.
However, there are crisis pockets where normal water supply is required to be provided.
Further, some portions of the three boroughs, covering a total number of 25 wards, are served through groundwater by means of power-driven big diameter tubewell. KMC authority desires to replace ground water by treated surface water.
It was learnt that the civic body's water supply department carried out a detailed survey of the area and reached the conclusion that one new water treatment plant is required to be constructed for substitution of ground water by treated surface water.
Recent News
◉ Dixon to establish Rs 1,000 crore laptop manufacturing unit in Tamil Nadu - Apr 10,2025◉ Sarovar Hotels commits investment of Rs 120 crore for new property in Tamil Nadu - Apr 10,2025
◉ Airbus & Mahindra Aerostructures sign manufacturing contract - Apr 10,2025
◉ Kerala CM to lay foundation stone for new building of district hospital at Vadakara - Apr 10,2025
◉ Wistron picks Shapoorji Pallonji to construct Rs 1,500 crore laptop manufacturing plant in Bengaluru - Apr 10,2025
◉ India’s Inox Solar secures land for 4.8-GW solar factory in Odisha - Apr 10,2025
◉ Timken expands bearing plant in Bharuch - Apr 10,2025