Bids have been invited by the Union Ministry of Road Transport & Highways (MoRTH) for construction of a road project in Uttar Pradesh.
The scope of work includes construction of two-lane with paved shoulder from the existing 0.000 km to 55.610 km (design ch 0.00 to 54.048) of NH-124D on EPC mode.
While the estimated value of the project is Rs 392.47 crore, the completion period is 24 months.