For more than three decades, Trident has been a pioneer in sustainable manufacturing.
Beginning with Wheat-Straw Paper, the company has now revealed that it has finished an 8.87 MWp solar power project at Budhni, Madhya Pradesh, of which commissioning of 5.48 MWp solar power plant (Phase 1) for captive use has been successfully completed and the remaining 3.39MWp solar power plant (Phase 2) is anticipated to be commissioned within the next 15 days.
In an effort to create a greener planet, the Group wants to use clean, renewable energy to cut carbon emissions.
The power produced by this solar power project will be used only by manufacturing facilities in Budhni, Madhya Pradesh, saving the company a significant amount of money.