Tender floated for DPR of pumped-storage hydropower project at Ukai Dam

A tender for the engagement of a consultant to conduct a feasibility study and create a detailed project report (DPR) for a stand-alone pumped-storage hydropower project at the Ukai Dam Reservoir in Gujarat’s Tapi district has been released by the Gujarat State Electricity Corporation (GSECL).

The freestanding pumped storage part of the Ukai PSP calls for the construction of an upper and lower reservoir close to the hamlet, with the lower reservoir being filled once with water from the adjacent existing Ukai reservoir.

The deadline for proposal submissions is July 31, 2023.

 

Site Moved. Visit our New Website

We have moved this news site from this URL to https://www.newprojectstracker.com/capex-news .

Visit this site for regular updates

Buy Latest Research Reports

Jayaparakash Sampath

Founder & CEO at NPT Research Information Services

Related Posts