![](https://www.newprojectstracker.com/blog/wp-content/uploads/2022/06/Report-ready-for-three-hydropower.jpg)
A tender for the engagement of a consultant to conduct a feasibility study and create a detailed project report (DPR) for a stand-alone pumped-storage hydropower project at the Ukai Dam Reservoir in Gujarat’s…
A tender for the engagement of a consultant to conduct a feasibility study and create a detailed project report (DPR) for a stand-alone pumped-storage hydropower project at the Ukai Dam Reservoir in Gujarat’s…