Metro lines 2A and 7’s second phase will soon be operational, according to the Mumbai Metropolitan Region Development Authority (MMRDA).
Dahanukarwadi in Kandivali is connected to DN Nagar by line 2A, and Aarey Road is linked to the Andheri Highway by line 7.
The MMRDA will use lines 2A and 7 for a 16-hour mega block on January 8 between 6 am and 10 pm to test integrated signalling systems and combine the first phase of metro lines with the second phase.
The MMRDA stated in a release that all civil construction as well as system upgrades for both metro lines had been finished. It claimed that once both lines are fully functioning, traffic on the roads will decrease.