The Sabarmati River Front Development Corporation has issued a request for proposals for infrastructural improvements.
Construction of a diaphragm wall anchor slab and earth filling with infrastructure services such as storm water drainage and interceptor line from upstream of the proposed barrage to ghat at Indira Bridge on the east bank of the river Sabarmati in Gujarat’s Ahmedabad district are included in the scope of work.
The project is anticipated to cost Rs 149.68 crore and will take 12 months to complete.