Nuberg EPC, a leading Indian global EPC and turnkey project management firm, has been awarded the coveted 10 TPD 2nd Generation Bio-Ethanol from Biomass plant project in Panipat on an LSTK basis.
Indian Oil Corporation Limited owns the project, which will produce ethanol for fuel mixing. Nuberg EPC will be the project’s single-point solution provider from concept through commissioning.
The project will be completed in 11 months, with mechanical completion anticipated for June 2022.
The 10 TPD Bio-Ethanol project is based on technology developed by IOCL’s R&D team, and is thus a Bio-Ethanol project that is entirely made in India.