NHPC has invited tender for Dugar hydro electric (HE) project in Chamba district of Himachal Pradesh.
The scope of work includes construction of civil works of diversion tunnels, dam & spillway, main and auxiliary Intakes, pressure tunnel/shaft (main & auxiliary), underground power house, draft tube tunnels, downstream surge chamber, pothead yard, tail race tunnels for main and auxiliary plant including planning, investigation, design, construction & testing of permanent bridge downstream of the dam connecting MAT and RB (right bank), other associated adits/structures, etc for Dugar HE Project.
The cost of the project is Rs 1,534.67 crore with a completion period of 73 months.