For the purpose of upgrading the NH-217 Paikan-Tura segment in the state of Meghalaya from kilometre 20.900 to km 47.075 Package-II to two lanes with a paved shoulder, bids are being accepted by the National Highways & Infrastructure Development Corporation (NHIDCL).
The project is expected to cost Rs 299.02 crore and will take 24 months to complete.
It is suggested that the project be carried out using the engineering, procurement, and construction (EPC) method with finance support from ADB.