The National Highways Authority of India (NHAI) has issued a request for proposals for an elevated corridor between Aroor and Thuravoor Thekku.
Under the Bharatmala Pariyojana in Kerala, the scope of work comprises the building of a six-lane elevated corridor as well as the improvement of an existing four-lane road at ground level from Aroor to Thuravoor Thekku (from 366.330 km to 379.082 km of NH-66) (length = 12.752 km).
The project’s anticipated cost is Rs 1993.88 crore, with a three-year completion period.