The Indian National Highways Authority has issued a request for proposals for the development of the Najibabad Bypass in Uttar Pradesh.
The project entails developing a segment of the Najibabad Bypass of NH-119 from 105.423 km to 118.373 km (excluding 2.45 km of NH-74 bypass) on an EPC basis (total project length – 10.764 km).
The project’s anticipated cost is Rs 294.85 crore, and it would take 24 months to complete.