NHAI invites bids for Danapur-Bihta Section’s four-lane elevated corridor

The Danapur-Bihta Section’s four-lane elevated corridor has received bid requests from the National Highways Authority of India (NHAI).

The project’s scope includes building a four-lane elevated corridor and at-grade improvements along the Danapur-Bihta Section from design Ch 0.000 to design Ch 19.870, along with 1.35 km of ramps and at-grade improvements to the four-lane section on the Danapur side, and upgrading the state’s existing two-lane carriageway to a four-lane carriageway from design Ch 19.870 to design Ch 23.500.

The project is expected to cost Rs 3737.51 crore and will take 30 months to complete.

 

Site Moved. Visit our New Website

We have moved this news site from this URL to https://www.newprojectstracker.com/capex-news .

Visit this site for regular updates

Buy Latest Research Reports

Related Posts