The National Highways Authority of India (NHAI) has issued a request for proposals for the four-laning of Bamni to the MH/TG Border.
The project involves four-laning the existing two-lane stretch of NH-930D in Maharashtra from Bamni (design 19.00 km) to the MH/TG Border (design 51.985 km) (design length 32.985 km) on hybrid annuity mechanism (HAM) under the National Highway System (O).
The project’s projected cost is Rs 859.33 crore.