Khayati Pipes and Power’s New Integrated Steel Plant
Khayati Pipes and Power is planning to take up new integrated steel plant in Hirebaganala, Koppal, Karnataka. The project involves establish Integrated Steel Plant which includes Sponge Iron Plant – 0.768 MTPA, Steel Melting Shop – 0.96 MTPA, Power Plant – 100 MW (4 X 12.5 MW-WHRB & 50 MW -AFBC), Hot Rolled Strip- 0.9 MTPA, Tubular products (Black Tubes – 0.35 MTPA & Galvanized Tubes – 0.15 MTPA), Pickling Line – 0.45 MTPA, Cold Rolling line – 0.3 MTPA, Cold Rolled Galvanizing line – 0.3 MTPA, Hot Rolled Galvanizing line – 0.15 MTPA, HR Cut to Length Plates & Sheets – 0.1 MTPA and Oxygen Plant – 0.0495 MTP. The estimated cost of the project is Rs.28850 million. As of February 2022, environment clearance for the project is underway.
Saraswati Power’s Integrated Cement Plant Project
Saraswati Power & Industries is planning to take up new integrated cement plant project in Tangeda, Vemavram & Chennayyapalem Villages, Dachepalli & Machavaram Tehsils, Guntur, Andhra Pradesh. The project involves setting up Greenfield Cement Plant with Clinker 2.5 MTPA, Cement 305 MTPA, Coal Based Captive Power Plant 50 MW Waste Heat Recovery Power Plant 15 MW and Colony 150 House. The estimated cost of the project is Rs.16287.2 million. As of February 2022, environment clearance for the project is underway.
To access all new projects covered today, download the report
Download Daily Projects Report – Issue No : 194
The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India