Inland Metallics’ Greenfield Steel Plant
Inland Metallics is planning to take up Greenfield steel plant in Tonagatu Village, Tehsil: Gola, Ramgarh, Jharkhand. The project involves planning to set up greenfield steel plant for production of 400,000 TPA Pellets, 250,000 TPA Sponge Iron, 250,000 TPA Pig Iron or 242,500 TPA Billets / Blooms (orin combination of any) and 30,000 TPA Ferro Alloys (Si-Mn) along with 16 MW captive power generation . The estimated cost of the project is Rs.4000 million. As of August 2021, environment clearance for the project is underway.
Time Technoplast’s Polythene and Plastic Products Mfg. Project
Time Technoplast is planning to take up a polythene and plastic products manufacturing project in Kistapur, Medchal- Malkajgiri, Telangana. The project involves expanding the manufacturing of polythene and plastic products HDPE Pipe & DWC Pipe (10000 TPA), Plastic blow moulded drums and barrels 4160 TPA and plastic injection moulded article 2208 TPA. The project is estimated to cost Rs.320 million. As of August 2021, the company has received consent from the state
pollution control authorities to establish the project
To access all new projects covered today, download the report
Download Daily Projects Report – Issue No : 056
The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India