Bhushan Power & Steel’s Integrated Steel Plant Expansion Project
Bhushan Power & Steel is planning to take up integrated steel plant expansion project in Rengali, Sambalpur, Odisha. The project involves expansion of integrated steel plant from 5 million tonne per annum to 15 million tonne per annum. The
estimated cost of the project is Rs.550000 million. As of July 2021, The Odisha government approved the investment proposal.
Manglam Chemicals’ Formaldehyde Mfg. Expansion Project
Manglam Chemicals is planning to take up Formaldehyde manufacturing expansion project in Parsakhera Industrial Area, Bareilly, Uttar Pradesh. The project involves expansion in existing facility of formaldehyde (37%) manufacturing from 450 TPM to 4500 TPM. The estimated cost of the project is Rs.21.2 million. As of July 2021, environment clearance for the project is underway
To access all new projects covered today, download the report
Download Daily Projects Report – Issue No : 040
The Daily Project Report compiled from new projects updated on the previous day is sent to all paid subscribers and has 15 New Projects in Energy, Infrastructure, Chemicals, Textiles, Paper, Cement, Steel, Water Treatment and other Manufacturing Projects in India