- Kakinada SEZ subsidiary of GMR Infrastructure, is planning to take up a new HDPE pipeline laying project in Mulapeta (V), Ponnada (V) and Ramanakkapeta (V), U.Kothapalli Mandal, East Godavari, Andhra Pradesh. The project involves laying HDPE pipeline with length of 2636 m for marine outfall system with capacity of 5 MLD for transporting treated effluents generated from various industries located within the Kakinada
SEZ to the LFP and from LFP into the sea till 700 m. The CD depth at the location of the marine outfall diffuser is 6.5 m. Outfall will have multiple port diffuser arrangement. The outfall pipeline shall be laid on the sea bed which will eventually get buried into the sea floor. The project is estimated to cost Rs.51 million. As of January 2020, the company has received consent from the state pollution control authorities to establish the project. - Aquatic Pipes & Tubes is planning to take up a new HDPE pipe manufacturing project in Manoharpura, Bhopal-Jaipur Highway, Rajgarh, Madhya Pradesh. The project involves manufacturing of HDPE pipe with capacity 8000 MT per Annum. The project is estimated to cost Rs.120 million. As of February 2020, the company has received consent from the state pollution control authorities to establish the project.
- Anuja Ceramics is planning to take up a new HDPE pipe manufacturing project in Mancheswar Industrial Estate, Bhubaneswar, Khordha, Odisha. The project involves manufacturing of HDPE pipe with capacity 6.72 MT/Day. As of May 2020, the company has received consent from the state pollution control authorities to establish the project
- Dec Industries is planning to take up a new HDPE pipes manufacturing project in Aipoor, Chityala, Nalgonda, Telangana. The project involves manufacturing of HDPE pipes with capacity 3 TPD. The project is estimated to cost Rs.301.1 million. As of July 2020, the company has received consent from the state pollution control authorities to establish the project.
- Shivaganga Polymers is planning to take up a new HDPE pipes manufacturing project in Industrial Growth Centre, Gundlapalli (V), Maddipadu, Prakasam, Andhra Pradesh. The project involves manufacturing of HDPE pipes (3000 Tons / Annum). The project is estimated to cost Rs.50 million. As of August 2020, the company has received consent from the state pollution control authorities to establish the project
- Polyraj Pipes is planning to take up new HDPE pipe manufacturing project in Rau Pithampur Bypass, Indore, Madhya Pradesh. The project involves manufacturing of HDPE pipe with capacity 15000 MT/A. The estimated cost of the project is Rs.209.4 million. As of November 2020, environment clearance for the project is underway.
This is just an illustrative list of new projects covered in our New Projects Tracker porta