Colaba-Bandra-SEEPZ, Line 3 of the Mumbai Metro, was completely tunnelled by the Mumbai Metro Rail Corporation (MMRC) on Wednesday. It will include the Metro stations in Mumbai Central, Mahalaxmi, Science Museum, AcharyaAtreChowk, and Worli.
The Mumbai Metro Rail Corporation (MMRCL) reached its 42nd and last milestone on the Colaba-Bandra-SEEPZ Metro-3 route today at the Mumbai Central Metro Station.
The Robbins-built TBM Tansa-1 completed 837 metres in 243 days from the Mahalaxmi Metro Station to the Mumbai Central Metro Station upline using 558 concrete rings.