Haryana Rail Infrastructure Development Corporation Ltd (HRIDC) opened technical bids on Tuesday for the 25.92 km Package C-23 of the 121.7 km Haryana Orbital Rail Corridor (HORC).
On an at-grade alignment, this section of Haryana’s first semi-high-speed rail line will connect Dhulawat (south of Sohna) with New Patli Station. Aside from minor bridges and station civil work on the main line, the scope also includes the construction of rail links from New Patli Station to the existing Patli and Sultanpur stations on the Indian Railways.
HRIDC had invited bids for the construction of this section in November 2021, with a 910-day (2.5-year) completion deadline and an unspecified budget.