The East Coast Railway has issued a request for proposals for the Khurda Road-Bolangir New BG Rail Link Project.
The scope of work includes bolt grouting and plate fixing for OHE and other allied works between Daspalla and Baniguchha stations of the Khurda Road-Bolangir New BG Rail Link Project, as well as tunnel T1 (800 mtr length, ch 106.825 km to 107.625 km), tunnel T2 (1,775 mtr length, ch 108.225 km to 110.000 km), and tunnel T3 (2,620 mt
The project’s anticipated cost is Rs 345.21 crore, and it would take 26 months to complete.