BHEL receives 2×660 MW thermal power project from NTPC

State-owned BHEL announced that NTPC had given it the go-ahead to build a 2×660 megawatt thermal power project. The project would be built using an Engineering, Procurement, and Construction (EPC) model, according to a statement from Bharat Heavy Electricals Limited (BHEL).

“BHEL has received a prestigious order for setting up the 2×660 MW Talcher Thermal Power Project Stage-Ill on EPC basis from NTPC Ltd,” it said.

In the statement, the company did not disclose any further details related to the project.

Talcher Thermal Power Project is located in Talcher, Odisha.

Site Moved. Visit our New Website

We have moved this news site from this URL to https://www.newprojectstracker.com/capex-news .

Visit this site for regular updates

Buy Latest Research Reports

Related Posts