The Indian government’s Ministry of Road Transport and Highways (MoRTH) has issued a request for proposals for upgrading the Kurwai–Mungaoli–Chanderi road stretch.
The scope of work includes rehabilitation and upgradation of the Kurwai–Mungaoli–Chanderi road section of NH-346 in the state of Madhya Pradesh on EPC mode, from design ch 0.000 km to 81.300 km (total length-83.1km) to two-lane with paved shoulder configuration, as well as one-time improvement in seven bypassed built-up areas in a total length of 22.615 km.
The project is anticipated to cost Rs 298.93 crore and would take 24 months to complete.