The National Highways Authority of India (NHAI) has issued a request for proposals for six-lane construction on the Nagpur-Hyderabad segment.
The project involves six-laning the existing four-lane stretch of NH-44 in the state of Telangana, from Kalkallu at 454.000 km to Gundla Pochanpally at 471.000 km, on the Nagpur-Hyderabad segment (design length – 17.000 km) of the Bharatmala Pariyojana on EPC mode.
The project’s projected cost is Rs 607.11 crore.