NTPC declared the commercial operation of its 17.5 MW portion of the 100 MW Ramagundam Floating Solar PV Project in Ramagundam, Telangana.
Furthermore, on November 1, 2021, the business declared commercial operation of Unit-2 (250 MW) of Barauni Thermal Power Station Stage-II (2x250MW).
With this, NTPC and the NTPC group’s installed and commercial capacity will be 53492.5 MW and 66917.5 MW, respectively.